My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-16-2012 Planning Commission Packet
Orono
>
Planning Commission
>
2012
>
07-16-2012 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2012 11:04:24 AM
Creation date
9/18/2012 11:04:13 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� • <br /> this denial was not directiv communicated to the landowner, who was the one who is now <br /> suffering the consequences. The landowner represents that, if he was made aware of a denial on <br /> the project he would have taken immediate steps to inquire further, and certainlv would have not <br /> authorized the contactor to continue to do work. The only two possibilities are that the notice <br /> was �iven to the coniractor who then disreg�arded the notice, or the notice was not �iven. In <br /> either circumstance it is the landowner who is now sufferin� the consequences, and who is <br /> respectfully askin� the Cit�personnel to �rant the variance so that he mav obtain a permanent, <br /> and lawful solution. <br /> Dated: , 2012 <' • / <br /> ussell Schumer <br /> � <br /> �t. <br /> �� � iZECE�IV'�D <br /> � JUN 0 6 2012 <br /> C9�'1(OF ORONO <br /> � 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.