My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-16-2012 Planning Commission Packet
Orono
>
Planning Commission
>
2012
>
07-16-2012 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2012 11:04:24 AM
Creation date
9/18/2012 11:04:13 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CMP Part 4C Comnrehensive Sewer Policv Plan <br /> � - Test and evaluate procedures for televising sewer service�lines in Casco <br /> Point area . � <br /> - Clean and televise approximately 4,000 feet of sanitary sewer and inspect <br /> manholes in the Hackberry area. Rehabilitation will be completed or <br /> placed on a priority schedule depending on the findings. <br /> Additionally, the annual replacement and/or retrofitting of existing lift stations is <br /> ongoing as a separate budget item from the UI program,providing the dual benefit <br /> of keeping the existing system up-to-date while eliminating further potential <br /> sources of UI. <br /> ORDINANCES, CONTROLS.ADMINISTRATION&ENF_ORCEMENT <br /> The City of Orono has adopted ordinances and controls for proper sewage <br /> treatment in both urban and rural portions of the city. , <br /> On-site sewage treatment systems have been regulated by the City since 1961. <br /> Municipal sewer connections have been regulated since 1964, the first year <br /> municipal sewers were available. The following is a chronological listing of <br /> ordinances applicable to sewage treatment in the City: <br /> � Ta'1i1e�4�-lb:.�'Sew�age-�reafinen�0r�lina�ces 19G1=2�0�07 � � - � � � � , <br /> =Or.dinance111umber�8c � 0rdinance Title:and:Description - . ; <br /> Date _ . • <br /> Ord.32- 11/13/61 REGiJLATING SEWAGE DISPOSAL SYSTEMS including site evaluation,design� <br /> and construction standards similar to WPC-40. <br /> Ord.35- 11/13/61 ADOPTING NIINNESOTA PLUMBING CODE including requirements for <br /> connection to available municipal sewer;standards for on-site disposal;acceptable <br /> materials and methods;and licensin of lumbers. � <br /> Ord.67-7/27/64 PUBLIC AND PRIVATE SEWERS codifying above ordinances into the Municipal <br /> Code. <br /> Ord.87-8/22/66 ADOPTING SEWAGE DISPOSAL SYSTEM CODE including additional design <br /> criteria and construction standards.See A endix. - <br /> Ord. 101 -12/9/68 HOOKUPS TO PUBLIC SEWER requiring connection to available public sewer,or <br /> annual ins ection of on-site s stems b a re 'stered en ineer.See A endix. <br /> Ord. 125-12/28/70 PROTECTING WETLANDS AND LANDS ABUTTII�TG MEANDERED LAKES <br /> AND WATERCOURSES including the prevention of filling,dredging or alteration of <br /> the wetlands or draina ewa s or on lands directl affectin such rotected areas. <br /> Ord. 143-3/12/73 1v1ETR0 SEWER-SAC establishing requirements for payment of SAC charges to <br /> MWCC. <br /> Ord. 152-8/27/73 DEFERRED SATIITARY SEWER HOOKUP DATE allowing 16 months from <br /> availabili of sewer until connection is re uired. <br /> Ord.210-4/13/78 ON-SITE SEWAGE TREATMENT CODE superseding Ord. 87 with state-of-the-art <br /> standards for soil evaluation,site evaluation,design and consiruction,plus <br /> establishment of maintenance requirements and annual City inspection program. <br /> Exceeds WPC-40 standazds and recommendations. See A endix. <br /> Ord.212-6/15/78 METRO SEWER STRENGTH CHARGE establishing MWCC sewage waste <br /> stren h char es.See A endix. <br /> City of Orono Community Management Plan 2008-2030 Page 4C-65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.