My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-16-2012 Planning Commission Packet
Orono
>
Planning Commission
>
2012
>
07-16-2012 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2012 11:04:24 AM
Creation date
9/18/2012 11:04:13 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
#12-3566 MTJSA Amendment <br /> July 11,2012 <br /> Page 3 <br /> System Design <br /> An extension of a small diameter force-main (approximately 700' of 1-1/2"pressure sewer line) <br /> under Orono Orchard Road to serve this property could be accomplished relatively easily at the . <br /> time the MCES forcemain construction in Orono Orchard Road is being done this summer. This <br /> would be in the same excavation as the MCES forcemain, connected to an existing City ' <br /> manhole. The applicants would eventually connect into this small pressure line via an individual <br /> grinder sta.tion. <br /> Staff Recommendation <br /> � Review the proposed amendment to the MUSA boundary, and hold the public hearing on the <br /> proposed amendment. Staff recommends approval of the proposed MLJSA amendment . <br /> 'Options for Action . <br /> 1. Recommend approval. <br /> 2. Recommend denial, stating reasons. � <br /> .,,: <br /> 3. Table far further informa'tion. <br /> 4. Other. <br />
The URL can be used to link to this page
Your browser does not support the video tag.