My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-16-2012 Planning Commission Packet
Orono
>
Planning Commission
>
2012
>
07-16-2012 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2012 11:04:24 AM
Creation date
9/18/2012 11:04:13 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Nothing herein contained shall prevent the city from taking such other lawful action as is <br /> necessary to prevent or remedy any violation. Such actions may include but are not limited to: <br /> (1) In responding to a suspected article violation, the planning director and the city may <br /> utilize the full array of enforcement actions available to it including but not limited to <br /> prosecution and fines, injunctions, after-the-fact permits, and/or orders for corrective <br /> measures to the guilty party. <br /> (2) When an article violation is either discovered by or brought to the attention of the <br /> planning director, the plannirig director shall immediately investigate the situation and <br /> document the nature and extent of the violation of the official control. As soon as is <br /> reasonably possible, this information will be submitted to the MCWD along with the <br /> community's plan of action to correct the violation to the degree possible. <br /> (3) The planning director shall notify the suspected party of the requirements of this article <br /> and all other official controls and the nature and extent of the suspected violation of these � <br /> controls. If the structure and/or use is under construction or development, the planning <br /> director may order the construction or development immediately halted until a proper <br /> permit or approval is granted by the community. If the aonstruction or development is <br /> already completed, then the planning director may either: (1) issue an order identifying �, <br /> the corrective actions that must be made within a specified time period to bring the use or '' <br /> structure into compliance with the official controls; or(2) notify the responsible party to <br /> apply for an after-the-fact permit/development approval within a specified period of time <br /> � not to exceed 30-days. � <br /> (4) If the responsible party does not appropriately respond to the planning director within the <br /> specified period of time, each additional day that lapses shall constitute an additional <br /> violation of this article and shall be prosecuted accordingly. The planning director shall <br /> also upon the lapse of the specified response period notify the landowner to restore the <br /> land to the condition which existed prior to the violation of this article. <br /> (Ord. No. 28 3rd series, § 1, 8-22-2005) <br /> Secs.78-1615--78-1630. Reseroed. <br /> ��..r,;_. <br />
The URL can be used to link to this page
Your browser does not support the video tag.