My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-21-2012 Planning Commission Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2010-2019
>
2012
>
05-21-2012 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2012 10:24:21 AM
Creation date
9/18/2012 10:24:12 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> . � �-lNA�- <br /> � MINUTES OF THE <br /> ORONO PLANNING COMIVIISSION MEETING <br /> Monday,March 19,2012 <br /> 6:30 o'clock p.m. <br /> Pla ing Staff recommends approval of the variances and the CUP for the existing and future obse ation <br /> platfo s. Staff also recommends approval of the variances to allow the pavilion to be construc d as <br /> shown. 1 of the City Engineer and Wetland Specialist's requirements, including wetland b er <br /> � improvemen and erosion con�rol measures,will be addressed with the administrative bu' ing permit <br /> (and land altera ' n permits)following variance and CUP approval. Submittal of a rev' ed survey and <br /> grading plan showi the OWI�,of Lake Classen should be required prior to City uncil review and <br /> •approval. Submittal o CWD approval of the projects should be required for t administrative permit <br /> as well. <br /> Justin McCoy, Orono Public Sch ls, stated this is an important project r their environmental program. <br /> The School District has moved ahea after receiving the funds and ha ooked at a number of options. If <br /> the pavilion is constructed within the r uired setbacks, it would re ire additional land alteration. They <br /> . have an ecosystem that they are focused o educating the stude on,which is why they are proposing <br /> the pavilion in the location that they are. Th variance will b equired for the proper placement of the <br /> pavilion and walking trails. <br /> .,��; � ,.. , . <br /> Schoenzeit asked if the area would be fully handicap cessible. , <br /> McCoy indicated it would be. The ground surfa would crushed granite. The goal is to comply with <br /> all best practices for hard surface runoff. � � <br /> Schoenzeit asked what the time frame fo the project is. <br /> McCoy indicated the deadline is Ju e 30'h in order to receive the fundin <br /> Chair Schoenzeit opened the lic hearing at 8:12 p.m. <br /> There were no public co ments regarding this application. <br /> Chair Schoenzeit c sed tlie public hearing at 8:12 p.m. <br /> Landgraver co ented this is a good opportunity for the students. <br /> Levang oved,Schwingler seconded,to recommend approval of Application#12-3548,Oron <br /> Schoo istrict,685 Old Crystal Bay Road North,granhng of variances and conditional use per it. <br /> VO : Ayes 6,Nays 0. � <br /> 6. #11-3503 CITY OF ORONO,ZONING CODE TEXT AMENDMENT-LAI�SHORE <br /> RESIDENTIAL ZONING DISTRICTS: DOCK RENTAL,8:14 P.M.—9:44 P.M.� <br /> Gaffron stated the City is considering two options for regulation of residential dock slip rental. <br /> Approximately one year ago Staff proposed an amendment to clarify the current regulations. The City <br /> Council has directed recently that this option be amended to allow docki�g of guest boats on a short-term <br /> basis since the cunent code does not allow that. The City Council also directed that another option be <br /> considered as part of this process,which is to essentially remove all the current prohibitions on residential <br /> dock slip rental. � <br /> Page <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.