My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-16-2012 Planning Commission Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2010-2019
>
2012
>
04-16-2012 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2012 10:06:54 AM
Creation date
9/18/2012 9:59:57 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. �. <br /> Memo <br /> $�jn� �, Bonestroo <br /> To: Darren Amundsen From: John Smyth <br /> File: 139-11000 Date: September 16, 2011 <br /> Reference: Wetland Code Review—400 Willow Drive South <br /> The proposed subdivision triggers the requirements of the City Wetland (ode. The wetland delineation indicates three wetlands <br /> are located within the property and are labeled Wetland A, B and C. Wetland A (east side of lot) is classified as a Preserve and . <br /> .y. , <br /> requires a 50 foot buffer, Wetland B (west side, south of driveway) is classified as a Manage 2 and requires a 25 foot buffer <br /> and Wetland L (west side, north of driveway) is not classified on the City Map. Wetland C will need to have a MNRAM <br /> completed to determine the appropriate wetland classificatian and buffer width. All other wetfand buffers are accurately depicted <br /> on the Certificate of Survey and Preliminary Plat . � <br /> Wetland fill impacts are proposed to Wetland B and Wetland C for the access road. The wetland delineation is currently out for <br /> review and no permit has been reviewed and approved by the Minnehaha Creek Watershed. The fill praposed in the wetlands <br /> will require a Wetland Conservation Act Permit from the Minnehaha freek Watershed District as will as review by the Planning <br /> Commission and approval by the (ity Council. Wetland and wetland buffer mitigation would be required as part af a permit <br /> submittal for approvaL <br /> Buffer Yegeta6on Requirements <br /> Based on the review of the wetland delineation report and discussions with the delineation consultant for the applicant the <br /> buffers are undisturbed grassland and woodland. We will review the buffers in the field to determine if any vegetation <br /> maintenance to remove invasive species is necessary. <br /> Wedand Buffer Markers � <br /> Wetland Buffer Markers will be required at least every 200 feet and there proposed locations should be shown on future <br /> submittals for fity Approval. Signage is available from the [ity and will be sold to the landowner. <br /> Recommendations <br /> It is recommended not to grant final plat approval until the Minnehaha Creek Watershed District hu approved the wetland <br /> delineation and proposed wetland fill. An escrow will be determined once the buffer vegetation is reviewed and approvals are <br /> received by the watershed. •, <br /> STANTEC CONSULTING SERVICES INC. <br /> One Team.lnfinite Solutions. <br /> 0 k\13911391100001communicallonslwetland ordinance compliance1400 wiltow drivelmem.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.