LEGAL DESCRIPTION:
<br /> Lot 138,Spring Park,Hennepin County,Minnesota. GRADING&EROSION CONTROL NOTES:
<br /> Streets and other public ways shall be inspected daily and if litter or soils has been
<br /> BEFORE DEMOLITION AND GRADING BEGIN
<br /> LOT AREA: 11,780 SF Install silt fence/bio roll around the perimeter of the construction area. deposited it shall promptly be removed. PC EXlliblt D
<br /> SCOPE OF WORK&LIMITATIONS: Sediment control measures must remain in place unti]final stabilization has been If necessary,vehicles,that have mud on their wheels,shall be cleaned before exiting the
<br /> 1. Showing the length and direction of boundary lines o}'the]egal description listed above. The established and then shall be removed. Sediment controls may be removed to site in the rock entrance areas.
<br /> scope of our services does not incl�de determining what you own, which is a legal matter. accommodate short term consWction activiry but must be replaced before the next rain.
<br /> Please check the legal description with your records or consult with competent legal counsel,if Moisture shall be applied to disturbed areas to control dust as needed.
<br /> necessary,to make sure that it is correct and that any matters of record,such as easements,that A temporary rock construction entrance shall be established at each access point to the portable toilet facilities shall be placed on site for use by workers and shall be properly
<br /> you wish to be included on the survey have been shown. site and a 6 inch layer of 1 to 2 inch rock extending at least 50 feet from the street into maintained.
<br /> 2. Showing the location of observed existing improvements we deem necessary for the survey. the site and shall be underlain Hith penneable geotextile fabric. The entrance shall be •
<br /> 3. Setting survey mazkers or verifying existing survey mazkers to establish the comers of the maintained during construction by top dressing or washing to prevent tracldng or flow of If it becomes necessary to pump the excavation during construction,pump discharge
<br /> property. sediments onto public streets,walks or alleys. Potential entrances that are not so shall be into the stockpile areas so that the double silt fence around these areas can filter
<br /> 4. Existing buildiog dimensions and setbacks measured to outside of siding or stucco. protected shall be closed by fencing to prevent unprotected exit from the site. ihe water before it leaves the site.
<br /> 5. Showing and tabula[ing impervious surface coverage of the lot for your review and for the DURING CONSTRUCTION:
<br /> review of such govemmental agencies that may have jurisdiction over these requirements to When dirt stockpiles have been created,a double row of silt Fence shall be laced to Temporary erosion control shall be installed no later than]4 days after the site is first
<br /> veri the are correctl shown before roceedin with construction. p disturbed and shall consist of broadcast seeding with Minnesota Department of
<br /> 6. Show ng elevations on the site at sele c d locations to ive some indication of the to a h of prevent escape of sediment laden runoff and if the piles or other disturbed areas are to Transportation Seed Mixture 22-]11 at 1001b/acre followed by covenng with spray
<br /> U P�b'r P Y remain in place for more than 14 days,they shall be seeded with Minnesota Department mulch.
<br /> the site. We have also provided a benchmark for your use in determining elevations for of Transportation Seed Mixture 22-1 11 at]OO lb/acre followed by covering with spra
<br /> construction on this site.The elevations shown relate only to the benchmazk provided on this mulch. Y
<br /> surve Use that benchmark and check at least one other feature shown on the survey when SITE WORK COMPLETION:
<br /> Y� When final grading has been completed but before placeme�t of seed or sod an`as b�i]Y'
<br /> determining other elevations for use on this site or before beginning construction. A dumpster shall be placed on the site for prompt disposal of construction debris. These survey shall be done per Ciry of Orono requirements to insure that grading was properly
<br /> 6. Whi]e we show a proposed location for this home or addition,we are not as familiar with your dumpsters shall be serviced regularly to prevent o��erflowing and blowing onto adjacent done.
<br /> proposed plans as you,your architect, or the builder are. Review our proposed location of the properties. Disposal of solid wastes from the site shall in accordance with Minnesota
<br /> Pollution Control Agency requirements.
<br /> improvements and proposed yard grades carefully to verify that they match your plans before When any remedial grading has been completed,sod or seeding shall be completed
<br /> construction begins. Also,we are not as familiar with]ocal codes and minimum requirements as including any erosion control blankets for steep areas.
<br /> A separate container shall be placed for disposal of hazardous waste. Hazardous wastes
<br /> the local building a�d zoning officials in this community are. Be sure to show this survey to said shall be disposed of in accordance with MPCA requirements. When turf is established,silt fence and inlet protection and other erosion control de�ices
<br /> officials, or any other officials that may have jurisdictiou over the proposed improvements and
<br /> obtain their approvals before beginning construction or planoing improvements to the property. Concrete truck washout shall be in the plastic lined ditch and dispose of washings as shall be disposed of and adjacent streets,alleys and walks shall be cleaned as needed to
<br /> 7. Note that all building dimensions and building tie dimensions to the property lines, are taken solid waste. deliver a site that is erosion resistant and clean.
<br /> froin the siding and or stucco of the building.
<br /> 8. While we show ihe building setback lines per the City of Orono web site,we suggest you show Sediment control devices shall be regularly inspected and afrer major rainfall events and
<br /> this survey to the appropriate city officials to be sure that the setback lines are shoH�n correcUy. shall be cleaned and repaired as necessary to provide downstream protection.
<br /> Do this BEFORE yon use this survey to design anything for this site.
<br /> 979.9
<br /> STANDARD SYMBOLS&CONVENTIONS: � ;�irb--�- � �9Js.n
<br /> ,.� I j �
<br /> "Denotes iron survey marker,fou�d,unless otherwise noted. 9J35 � I 94z.o
<br /> I i � � I
<br /> �) I � t � I
<br /> II � � � 'j � � sso.e
<br /> 94B.7 �
<br /> �' I � I jl' I V �9i9.0
<br /> �1 � � � , � � I � /� ��\
<br /> i ' �t-Lighf��o% 1 O Existing p11,e//in9 a ; � I-951�' j�� �
<br /> � 979.5 � � I9J1.9� � � m l 0
<br /> �� -sJtr;-"-- ---' 739 �� J� � � � �o� s51.o C ,C F
<br /> �� i , 9aa5,1_ --�--r --I- 1/I'9<ah- A1 ��F% [- ; �o..
<br /> i.i_ �f FA✓n d P. I I 947'� � S�T/•� 6 .CQQ� ciY.S. I V C
<br /> � �I ��R9.�zi y�Tr�e q r�� � � � �-� .29- aa. a"0 �0°i ; �'iOrp 3 m i°o,'nti �`
<br /> � Ic-^�""-�-_ � �'� -'�91.,�� � �� � , ^'Si/t Fmee �o i 9e �
<br /> �� i -'b-- i 7.$ �i'�-I-�_� 94.4 �O Jg/6 i f� O: � 949.J I X351
<br /> q29.J ry � ��S:e � � I 941 �I4X " �^ -`� 9b� �9 \1.1 95JJ O
<br /> � / i 9J1.7 � � � '�� I fbp�k � 9y� V' 9.50�,� � � 950 951.3 �
<br /> .l� u) � r I 9�11.J�"{�J 11 Q! / _ ti �L � .F n0 p
<br /> � � i Flo�pole-' � 1 � �'^ ' � I,%' k 56.0 - .g51 Exist Woter 9�.3
<br /> i � a�
<br /> C / � � � �' � � r� ,.ro ; � eir.eX � q m Stoop�Steps _, � , s �'P , ervice, � SF 3 X9e�s
<br /> � 'h i rn m � ar. o � � ti
<br /> �j 4 '� ' , (',� � 1 � � Si/t Fenee�� tn�q �n PROP.DWELLING ��ndow �.-�i yas Exist. o _"- 3 2 ,�
<br /> /�.� Sewer,
<br /> �' :0 O�; � ' / m We/l �qito�l�„ e
<br /> i'fY/ ry ' � / �,. y/ K k Q 70.0 1 ST FL.=955.05 � o� YI C950.B Se�yCe y
<br /> A /i '�;';- (0 � � N
<br /> i i �'�_ � � � � i I o'yp� m � � o h TOPFOIJND.=953.36/ N h�`Z'� osed � h 9sta�,� ti� � •~
<br /> � �'�. 16" Tneel� o,�o � v x � f�P �j � �V
<br /> ,�,,� G��i BSMT FL.=944J0 9 s ` �+ ,P � 2.OX' Q' � S
<br /> � �� l�;I �i� � (j�_F�',� �(}c�",�sn � � m �' 4�1 �/GARAGEFL.=952]0 / �� M/�ylaY �ii � '' �
<br /> � , [_ �ic � f"ri_�9sr � i ba���yl 9479 � � r o� 3.5 {��o'9priv� i i�� I 'p� 3-�__
<br /> ,
<br /> reze.e�zg, Cight Po�e ,'� I � ��_y..` y,? , � � N� � a 6.�1 9,S2.B ssX �l a '0'_
<br /> s�e.e,' �/ sy�77" Tr�e I�_ 1� � � ��� s e . �h . -�-lnsto//Rock
<br /> i Stone, ����� ��. �a.e�,- i_ � ��ti � , 4 � 9si.2 Xs�.e
<br /> p 3z6�' 1' 18""ITiee, / ,, � � i ss�.�X Construction
<br /> � , Woll as� , � � i '�=� ' iq:0 9 4 T � � m.s2 � h � En tronce(Refer
<br /> s2e s , � t 3a.a - � , �/ *s � {Yo/k � T � �Q ,g7� � to NotesJ
<br /> i � ( _, s«l�e P'on T I I � % ,,�Re. Wo/l '-:'` Jg 3p ,
<br /> ���
<br /> f.�i��rFiN� s.�us M � h �' O� �, �c_��� �/7� k 3'� I9a�9/ 9az� _ �� _� "--// � 3
<br /> ,i.y A.�sa�' _1 1B �Tr e� � 7 Tree, ��r9fB� 9 0�0��._ 95.�-. t! �952.9 � v� �
<br /> �YISTINGCONTDUJP - - -9a5- - - °qjo I -'�_i �; i j ��, �841 ses � ^�' �� esos �
<br /> ��-���'� I
<br /> vD o°v � / ^-._,� /� � � 4.9�- " X9sr.� i SF �S � �-Si/t Fence
<br /> E X I S T I N G S P O T L�'L E K�T l O N x 9as.s E.. �c � l`s.z' / �ee,.o _ -_�
<br /> ,
<br /> N , y 8 �-Si/t Fence �
<br /> ���� � � r / °���<�;�� � '� 352 2O••E t� h�.� 2.2 �.� ! 9 .
<br /> O O I I I � p ___
<br /> � i m� o`p` `ai�-1_ \\ � E.Y �' � x�zs
<br /> P�40POSED CONTOUR 945 � � �°' �' � ` 950� S'
<br /> �Ir , � / - ' ° Go� i9
<br /> I °9e � �
<br /> PROPOSED ELE'Y.9TION/SPOT BLEYATION 945.5-� � �I I�� / ',//; ��
<br /> � �I � ' � ;/ ; � Existin9 Dwe//in
<br /> DRAIN�IG�'ARROIY - FLOIY � i ' �' �� � % � g ss,-� �9539
<br /> ' � ' ; ' ' I � � � � ��
<br /> 9`.'�
<br /> SILT FL�'NCE/STlIA/Y LOCS gF yJJz I ' � ' I ' �I i , �' i `1
<br /> �93B10 I i , � � � ._._, r i Q I\ I
<br /> \�
<br /> OnTE REVISION DESCRIPTION DWG ORIENTATION SCAIE CLIENT/JOB ADDRESS i�amr m+nvv n�ei iws auu,�crnc�nw oa DATE SURVEYED� SHEE'f TITLE SHEET NO.
<br /> - � RFPORi WA$PqEPM[p BY YE Oft UN�EA YY p1�[i '
<br /> OT�T A d van c e ��N90N MD 7NAi I IL�WLT IIQN�O�l FEBRUARY 6,2016
<br /> D USTIN QL CASIE i1LNDL ENdNFIIt U E uMS 0�iH STetE or Y�ESOTA SURVEYED BV�. ADVANCED SURV. PROPOSED SURVEY
<br /> Surveying&Engineenng,G'O. 8 ENGINEERING,CO � �
<br /> N `�B4J CASCO POI.�VT ROA.D �� s.a��oxe DATE DRAFTED: DRAWMG NUMBER
<br /> 5300 Sou�h Hwy.No 101 5 sc'o
<br /> ORONO,MN Ninnebnka,Mlnneso�e 55345 AUGUST 16,2016
<br /> o io za ano��esz�a�aaesa `�� " #160795�TR
<br /> � wae�.www.oan��.�om Auaust 16.2016
<br /> SMEET 1 OF 1
<br />
|