My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-19-2016 Planning Commission Packet
Orono
>
Planning Commission
>
2016
>
09-19-2016 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 2:23:27 PM
Creation date
9/20/2016 10:08:30 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
276
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
August 25, 2016 <br /> Page 2 <br /> The proposed development condition has been examined using P8 water quality <br /> modeling software to show the impact of the development on storrnwater quality <br /> delivered to Long Lake. The proposed option is also compared to a benchmark of a <br /> lower-density(all lots 2+ac)that is compliant with current stormwater rules to show the <br /> improvement over both the existing condition and an alternative development scenario. <br /> (Table 1) <br /> Table l. Total Phos horus Loadin Com arison <br /> Total TP Total TP after BMP Conceptual <br /> Scenario Generated treatment BMP Volume <br /> (Ibs/year) (Ibs/year) [cfJ <br /> Existing Conditions 3.1 3.1 none <br /> Proposed Development <br /> (exceeds stormwater <br /> requirements) 13.1 0.4 32,670 <br /> Benchmark Development <br /> (meets stormwater <br /> requirements) 8.3 0.5 13,068 <br /> Summarv <br /> This memo shows that the stormwater management plan for the project improves the <br /> water quality delivered to Long Lake. <br /> Attachments: <br /> 1. Concept Stormwater Management Plan on Concept Sketch Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.