Laserfiche WebLink
16-3855 ' <br /> September 14,2016 <br /> Page 8 of 10 <br /> Parks, Trails, Sidewalks <br /> There is an existing trail along the west side of Brown Road. The CMP does not suggest any <br /> plans for a future parallel trail on the east side, and all other lands along the east side are fully <br /> developed with no trail easements in place. <br /> RPUD standards require that 10% of the development site be provided as a private recreation <br /> area or open space to serve the residents of the development. The site as designed would appear <br /> to have sufficient open space to meet this objective. The applicants have suggested they would <br /> place a 10' trail easement along all interior roadways to help meet the 10% goal. Planning <br /> Commission should consider what other types of recreation space, if any, would be appropriate <br /> within the development. <br /> Park Dedication <br /> In addition to the RPUD requirement for creation of a private recreation area to serve the <br /> development residents, the City Code requires dedication of 8% of the land as public park, or <br /> payment of the equivalent value in cash. Assuming the City Council finds no need for a public <br /> park at this site, payment of the standard Park Dedication fee for 23 new building lots (credit for <br /> two existing homes) would be appropriate; the current fee ranges from a minimum of$3,250 to a <br /> m�imum of $5,550 per lot, for a potential total fee of $74,750 to $127,650. The subdivision <br /> proposal should be reviewed by the Park Commission once a preliminary plat application is <br /> filed. <br /> Stormwater and Drainage Improvements & Fees <br /> The applicants are proposing a stormwater management system incorporating a variety of <br /> methods including water re-use, pervious pavers, raingardens, ponding and sand-iron filters to <br /> result in an improved quality of runoff entering Long Lake. See Exhibit C-m. Ponding areas <br /> will require the establishment of easements and the ponding areas will not be creditable as dry <br /> buildable area. Stormwater management will be subject to City and MCWD review and <br /> approval. <br /> RPUD development is subject to a m�imum hardcover per lot of 50%. It is anticipated that <br /> even the smallest lots will not have any need to exceed this limit. <br /> The property will be subject to the Stormwater and Drainage Trunk Fee. Final calculation of the <br /> fee should be based on the final lot count and density. If for example the division of zoning <br /> results in seven 2-acre lots at $4,030/acre and eighteen smaller lots averaging 1/3 acre at <br /> $7,275/acre (2016 Fee Schedule), the estimated Trunk Fee would be: <br /> (14 ac x $4,030/ac plus 6 ac x $7,275/ac)_ $56,420 + $43,650 = $100,070. <br /> Utility Locations/Availability/Assessments/Connection Fees <br /> Municipal gravity sewer and water utility mains are available in Brown Road across from the <br /> southwesterly corner of the property, and subject to City Engineer review should have adequate <br /> capacity to serve the additional homes proposed. The property has not been previously assessed <br /> for sewer and water; the project is outside any established S&W assessment district. Because the <br /> developer will be installing sewer and water systems to serve the development at the developer's <br /> expense, no additional sewer and water connection charges ("local SAC and WAC") are <br /> anticipated as of this writing. Water system looping and capacity for fire protection are some of <br /> the factors that need to be addressed by the City Engineer. It is assumed that all utilities will be <br /> underground and located within the right-of-ways. <br />