My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-15-2016 Planning Commission Packet
Orono
>
Planning Commission
>
2016
>
08-15-2016 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 2:23:27 PM
Creation date
9/20/2016 9:27:05 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Oronq MN Code of Ordinances Page 15 of 19 <br /> Trails When any portion of the projett is within 1,000 feet of a public trall system, pedestrian <br /> access shall be provided to the trail system by means of a public trail constructed at the developer's <br /> expense. Where public rights-of-way are available, at the city's discretion the trail may utilize the <br /> publlc right-of-way.Trails shall be of bituminous construction, or such other material as may be <br /> approved by the city and shall be not less than eight feet in width. <br /> (Qrd. No. 202 2nd series, g 1(5),2-26-2001; Ord. No. 94 3rd series, § 2, 9-24-2012) <br /> Sec.78-627. - Review of application; procedures. <br /> {a) Concept p/an review. In order to receive guidance in the design of a RPUD prior to submission of a <br /> formal application, an applicant may submit a concept plan for revfew and comment by the planning <br /> commission and city council. Submission of a concept plan is optional but is highly recommended for <br /> large RPUDs. In order for the review to be of most help to the applicant,the concept plan should <br /> contain such specific Information as is suggested by the city. Generally, this information should include <br /> the following: <br /> (1) Approximate building, road and trail locations; <br /> (2) Height, bulk and square footage of bulldings; <br /> (3) Type and square footage of specific Eand uses; <br /> (4} Number of dwelling units; <br /> (5) Generalized grading plan showing areas to be cut,filled and preserved; and <br /> {6) Staging and timing of the development. <br /> The comments of the planning commission and city council shall address the consistency of the concept <br /> pl�n with this section.The comments of the pfanning commission and city council shall be for guidance only <br /> and, if positive, shall not be considered binding upon the planning commission or city councii regarding <br /> approval of the formal RPUD application when submitted. <br /> (b) Masterdeve%pmentp/an and�ezoning.Approval of a rezoning ta RPUD and approval of a rnaster <br /> development plan shall be subject to the procedures Qutlined in this chapter for a zoning map <br /> amendment.The master development plan shall contain the foAowing: <br /> (1) Building location, height, bulk and square footage; <br /> (2) Type and square footage of speciflc land uses; <br /> (3) Number of dwelling units; <br /> (4) Detailed street and utility locatlons and sizes; <br /> (5) Parking layout; <br /> abaut:blank 8/8/20l 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.