My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-15-2016 Planning Commission Packet
Orono
>
Planning Commission
>
2016
>
08-15-2016 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 2:23:27 PM
Creation date
9/20/2016 9:27:05 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B. S.ewer snd 'Water Connection Charg�s. For any Phase for which Final Plat Approval is <br /> graIIted aftcr December 31,2UO3,the Sewer and Wates Counection Chazges due shaU be <br /> recalculeted based on the then current City Fee Schedule SWCC rates. `Ths Developer <br /> shall be allowed to prepay SWCC fees far future Phases at the 2003 rate no later than <br /> Dec.embex 31,2Q03. <br /> C. Storm Water & Drainage Trank Fees. For any Phase far which Fival Plat Approval is <br /> granted after Deceanber 31,ZQ03,the 5W&DT du�sha1�be recaiculated based on the then <br /> cuzre�at Ci#y Fes Schedule SW&DT rates. The Dcveloper ahall be allowed to prepay S W& <br /> DT f�ees for future Phases at tb.e 2003 rate no latea thaa December 31,2003. <br /> VI. Pending MnDOT Stormwater Pond Charge <br /> MnDOT hes established a$35,400 charge to the City for constrnctian of the cxisting storcnwater <br /> pond withia the MaDOT right-of-way. If the City ia unsucc�ssful in e�invnating tlua cdaarge,the <br /> Develo�er has a,greed to pay a portion of this charge,amount to be esta.blishcd,p er the Devel.oper's <br /> letter of Oetober 2,2002 on file in flie City Of�ices. <br /> Page4of4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.