My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-15-2016 Planning Commission Packet
Orono
>
Planning Commission
>
2016
>
08-15-2016 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 2:23:27 PM
Creation date
9/20/2016 9:27:05 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
e) Dae to the Phasing of the project and the resultant lengthy period of tiine the site will be <br /> under construction,the Devcloper shall as a condition of the PiTD No.4 Agreement provide <br /> an escrow(emount to be detennined)to cover the inspection costs of ango ing e�osion control <br /> inspections. <br /> �} Tb,e Developer shall obtain all necessary pe�nits (including but not li.mite�l t�NPDFS, � <br /> MCWD and MnDOT pennits} from ihe appropriate agencies for erosion control prior to <br /> commencing excavation on the site. <br /> g) In the eveart that the Developer's NPDES peamit requaes a B est Management Practices Plan, <br /> such pian shall be submitted ta th�City priar to coinmenciug excavation on the site. <br /> h) The cflnsfruction limits shal� be clearly marked with adequa#e fenci�g to prevent any <br /> construckion darnage or disturbance of any trees and vegetation outside of the construction <br /> limits area. Prior to commencing excavarion on the si#s,Developer shatl ideatify trees to be <br /> preserved, shall mark them on a site plan, and shall tal�e extraardirxary measures such as <br /> fencing,signage,etc.to e�,sure they are not disturbed. <br /> 5. Other General Conditfons <br /> a) Monwnent signs as depicted izi Sheet�L7.1 and others may b e provided by t�e developer at <br /> each entrance to the RPUD development aite. The signag�shall be limited to a developmeat <br /> name and/or loga and street address on the monument signs. Any changes ko the final <br /> designlmateriels of monument signage from those shown on the apgroved plans shall be <br /> subject to approval by the City Council. <br /> b) Any desig�,miatexial or specification revisions from the approved plans involving streets, <br /> utilifi,es,stocro sewer facilitzes,greding or the regional pond shall bc sizbjoct to approval by <br /> the City En.gineer prior to implementation of such ehanges. <br /> c} Any dasign,material or specification revisions from ttie approved plans involving dweiling <br /> �anit design guidelines, architcctural styles,building location, site landscaping, and other <br /> approvedlrequired site amenitiss,shall be subj�ct to approval by the Planniiig Director and <br /> may be subject to review azxd apgroval by the City Councii at the discr�tion�f the Planning <br /> Diiector. <br /> d) Prior to release of the final plat,City Attorney shall review and approve the cavenants and <br /> documents descn'bing the�reation,structure,rights,obiigatians and responsibilities of the <br /> variaus homeowners associations serving the development. The oovenants shall include <br /> conditions of this resolution that have slot been met as of the release of the plat, provide <br /> cotnmon access eesetnents foz each lot that raceives access from a shared private street or <br /> driveway,and shall provide for ma'tntenance of all coiiunon areas. <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.