My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-15-2016 Planning Commission Packet
Orono
>
Planning Commission
>
2016
>
08-15-2016 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 2:23:27 PM
Creation date
9/20/2016 9:27:05 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
16-3855 <br /> August10,2016 <br /> Page 6 of 9 <br /> Highway 12, and if MnDOT approval is obtained. Portions of the trail inay be located within the <br /> right of way of Kelley Parkway north of the stormwater pond. The trail shall provide a continuous <br /> connection along Highway 12 from the east boundary of the property to the west boundary; <br /> connection across the stormwater pond area inay be along Highway 12 or may jog up to and back <br /> down froin Kelley Parkway along the stormwater pond perimeter. <br /> i) The Ciry shall be responsible for maintenance of the public trails upon their completion and <br /> acceptance. Public easements including a suitable shoulder width shall be granted over all the <br /> public trails not located in dedicated right-of-way. <br /> Preliminary Hennepin County plans for the upgrade of Wayzata Boulevard include a trail along <br /> the north side of Wayzata Boulevard from Willow Drive to Old Crystal Bay Road. Final <br /> determinations have not been made as to whether or exactly where that trail will be developed. <br /> The current plans suggest it will be in the right-of-way, while the Stonebay PUD Agreement <br /> intended for it to be within the commercial Outlots. Pending a final layout by the county,applicants <br /> should expect that a trail will be required along their south boundary, with a possible connecting <br /> link to Kelley Parkway along the west edge of the stormwater pond. <br /> An existing sidewalk within the right-of-way of Kelley Parkway extends along the entire frontage <br /> of the site, constructed with the original Stonebay improvements. <br /> RPUD standards indicate the requirement for 10% of the site being dedicated to recreational <br /> purposes. The proposed pond pavilion and perimeter bike pathway would potentially satisfy that <br /> requirement. Development of the property is also subject to a Park Dedication Fee per the <br /> rpovisions of the PUD No. 4 Agreement (see Development Fees Summary below). <br /> Development Fees Summary <br /> Development of the property is subject to the various fees established within Exhibit M of the PUD <br /> No. 4 Agreement, all of which were deferred until a development plan is approved for each of the <br /> commercial outlots(Outlots A&D). Below is a summary of the fees, collectible in full at the time <br /> of final re-plat approval: <br /> Park Dedication Fee: <br /> $3,250/unit x #of units (example: 48 units x $3,250 =$156,000 <br /> Sewer Connection Charge: <br /> $6,330/acre x 3.5 acres = $22,155.00 <br /> Water Connection Charge: <br /> $10,480/acre x 3.5 acres =$36,680.00 <br /> Stormwater& Drainage Trunk Fee: <br /> Residential >4 units/acre: $8,490/ac x 3.5 acres = $29,715.00 <br /> Note that per the Agreement, the Park Fee is not adjusted for inflation, while the connection <br /> charges and Stormwater & Drainage Trunk Fee are calculated based on the current (2016) Fee <br /> Schedule. <br /> Site Grading, Stormwater and Drainage Improvements <br /> The long stormwater pond was originally sized to accommodate all elements of Stonebay, so that <br /> individual ponding will not be required on this site. Because the site is so flat, the assumption is <br /> that in order to make drainage function adequately and allow for underground parking,the site will <br /> require some amount of fill, likely raising the main floor above the level of Kelley Parkway. <br />
The URL can be used to link to this page
Your browser does not support the video tag.