My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-22-1989 Council Minutes
Orono
>
City Council
>
Minutes
>
1980-1989
>
1989
>
05-22-1989 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2012 11:55:20 AM
Creation date
9/5/2012 11:55:20 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE ORONO COUNCIL MEETING OF MAY 22, 1989 <br />• ENGINEER'S REPORT: <br />LIFT STATION #10/ #43 - BID AWARD <br />City Administrator Bernhardson apprised the Council that six <br />bids had been received for the combined projects for lift <br />station #43 and #10. The lowest bid was $181,640.65 and there <br />would be an additional 25% added to that to cover legal and <br />engineering, and administrative fees. The total would be <br />substanially less than the $275,000 estimated cost for the <br />project. <br />City Engineer Cook gave a brief synopsis of what the project <br />would entail. The funding for part II of the project would come <br />from revenue funding. There would be two options for funding <br />part I of the project. Option one would be to fund 25% of the <br />cost through the sewer operating fund, which would amount to <br />$39,250.00. This would be a 20 year payback on the operation of <br />the lift station. The remaining cost of the system, $117,700.00 <br />would come from future service connections in that district at <br />the cost of $1,407.00 per unit. Option 2 would involve charging <br />50% back to the revenue fund and the connection charge would pick <br />up the balance, which would be $980.00 per unit. <br />Councilmember Goetten questioned whether public hearings <br />were required for these projects. Bernhardson replied that the <br />• City was not ordering a special assessment. There would be a <br />connection charge which had no statutory need for a public <br />hearing. Bernhardson said that it would be appropriate to hold <br />some form of public information meeting . He noted that this <br />would only apply to undeveloped property and would not affect <br />those already hooked up to sewer. Goetten replied that even <br />though the property was not developed, it was still privately <br />owned. Cook interjected that a fee ordinance amendment would be <br />required to establish the connection charge. <br />Mayor Grabek surmised that the Council would vote just on <br />approving the low bid. Cook said that staff would recommend that <br />the bid be awarded to Albrecht Excavation, Inc. He said he has <br />worked with the contractor on other projects and felt confident <br />that they would do a satisfactory job. <br />It was moved by Mayor Grabek, seconded by Councilmember <br />Nettles, to accept Albrecht as the lowest bid on the project. <br />Motion, Ayes =4, Nays =O, Motion passed. <br />It was moved by Mayor Grabek, seconded by Councilmember <br />Goetten, to table the method of financing the project until such <br />time that the owners of the affected propety could be notified. <br />Motion, Ayes =4, Nays =O, Motion passed. <br />• UTILITIES HIGHWAY 12 - BIDS AND SPECIFICATIONS <br />City Engineer Cook indicated that the City was seeking <br />approval of the plans and specifications to advertise bids for <br />the sanitary sewer and water main along Highway 12 to serve the <br />Rebers and Otten subdivision. Cook explained that after meeting <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.