My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-12-1988 Council Minutes
Orono
>
City Council
>
Minutes
>
1980-1989
>
1988
>
12-12-1988 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2012 4:45:19 PM
Creation date
8/27/2012 4:45:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• MINUTES OF THE ORONO COUNCIL MEETING OF DECEMBER 12, 1988 <br />ZONING FILE #1334- REBERS CONTINUED <br />replied that it would be approximately 33,000 s.f., or 3/4's of <br />an acre. With 5 lots it would be approximately the same, and <br />would provide for the same number of lots. <br />Planning Commission Bellows calculated that with using a 4- <br />lot configuration, and the 80% buildability, it would provide the <br />builder with 44,800 s.f. of pad. Mr. Kost said that the average <br />building pad, using 6 lots or 4 lots would be 8,000 to 10,000 <br />s.f. per lot. However, with the 5 lot proposal, the building pad <br />would be 7,500 s.f., because of additional acreage that would be <br />designated to the trail area. <br />Mayor Grabek believed that the concerns of the adjacent <br />property owners had been addressed. He stated that it would be <br />his preference to have one more smaller house, as opposed to 4 <br />very large homes, as well as the extra 20' buffer. <br />It was moved by Mayor Grabek, seconded by Councilmember <br />Callahan, to accept the preliminary subdivision of Sid Rebers, <br />conditioned upon the developer and City working to control the <br />construction traffic, that the main access road be placed where <br />mutually acceptable to the adjacent homeowners on the east side, <br />• and that the northern boundary line have 5 lots with the <br />additional 20' of buffer from the adjacent neighbor. Further, <br />the preliminary subdivision, should reference the individual <br />agreements pertaining to the evergreen buffering, fence and <br />electric connection, as well as adequate drainage being approved <br />by the Watershed District and Mr. Rebers being financially <br />responsible for construction damage to North Brown Road. <br />Callahan concurred that it may be necessary to plant more than 40 <br />evergreens along the Platteter property to achieve the desired <br />screening. Mayor Grabek amended his motion to include language <br />that whatever needs to be done to adequately shield the <br />Platteters' house be done. Councilmember Nettles asked the <br />Platteters as to their preference between the 4 and 5 lot <br />proposal. Mr. Platteter replied that the farther the proposal <br />strayed from the Comprehensive Plan, the more screening would be <br />required. He said his concern involved privacy, and that he <br />preferred 4 lots. Motion, Ayes =2, Nettles, Goetten and Peterson <br />Nay. <br />It was moved by Councilmember Goetten, seconded by <br />Councilmember Nettles, to approve 25 lots, with 4 lots along the <br />northern boundary with evergreen buffering and a fence, the <br />details of which would be agreed upon between the Platteters and <br />developer, and attached to the resolution, and the language <br />referring to the existence of said agreement be included in the <br />resolution. Further that drainage in the lower southeast corner <br />• be addressed. With regard to Brown Road being used for <br />construction access, that the proposed access be used and that <br />appropriate signage be posted, and the City monitor activities. <br />The outlot for the commercial property frontage road be <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.