Laserfiche WebLink
i /� <br /> � �,u � c� � <br /> :� <br /> � � Daily Soil Observation Notes <br /> Project No: Date: Report No: <br /> Project Name: Project Location: <br /> Client: Temp/Weather: <br /> Project Manager: Time Arrived: ' Departed: <br /> Areas Observed: ❑ Building Pad ❑House Pad ❑Roadway ❑Parking/Walks ❑ Footing <br /> ❑Proof Roll ❑Other(describe): <br /> Soil report available? ❑ Yes �No Report reviewed? ❑Yes ❑No Report prepared by: <br /> Finish floor evaluation: Bottom of footing elevation: -- � Bottom of excavation elevation: <br /> Approved plans available? ❑Yes ❑No Specified compaction: Fill source: <br /> Oversizing appears adequate? ❑NA []Yes ❑No Soils observed agree with Soils report? ❑Yes ❑No � <br /> Soils appear adequate for design loads? QYes ❑No Proposed project bearing capacity(psf): <br /> Contractor notified of results? ❑Yes ❑No Name of person nptified: - <br /> Was a copy of this report left on site? [�Yes ❑No If so,whom was it submitted to? ' <br /> ., : <br /> N <br /> { <br /> ,. - <br /> � <br /> f; � <br /> Notes/Comments: <br /> f+ <br /> � <br /> Performed By: Reviewed By: Date: <br /> This is a preliminary report and is provided solely as evidence that field observations and/or testing was performed.Observations and/or conclusions and/or <br /> recommendation conveyed in the final report may vary from,and shall take precedence over,those indicated in a preliminary report. <br />