Laserfiche WebLink
M�ica�adness <br /> From: Christine Mattson <br /> Sent: Tuesday, October 25, 2016 1:53 PM <br /> To: 'Jorj Ayaz' <br /> Cc: Stephen Rudolph; Monica Fadness; Rachel Dodge; Roger Peitso <br /> Subject: RE: 2480 Casco Point Road/#2016-00348 <br /> Jorj, <br /> We have reviewed and approved the electronic copy of the foundation as-built survey for the in-kind replacement of the <br /> boat house. You may proceed with framing. A copy of this email authorizing yau to proceed should he kept on site <br /> witF�the inspection card. <br /> Also, please submit a full-size copy of the foundation as-built survey for our records. The electronic copy emailed must <br /> be printed on 22"x 34" paper and we are only able to print up to 11"x 17" in-house. <br /> Please don't hesitate to contact me if you have any questions. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway ( Orono � MN � 55356(physical address) <br /> PO Box 66 � Crystal Bay � MN J 55323-0066(mailing addressJ <br /> '� 952.249.4620 � 8 952.249.4616 <br />� cmattson@ci.orono.mn.us � � www.ci.orono.mn.us <br /> Office Hours: Monday-Friday 8 am to 4:30 pm <br /> OUR OFFICE WILL BE CLOSED: Friday, November 11, 2016 <br /> Thursday& Friday, November 24& 25, 2016 <br /> From:lorj Ayaz (mailto:jorj@aspenshowroom.com] <br /> Sent:Sunday, October 23, 2016 10:27 PM <br /> To:Christine Mattson<CMattson@ci.orono.mn.us> <br /> Subject: Re: 2480 Casco Point Road/#2016-00348 <br /> Hi Christine, <br /> Advance surveying and engineering came out and updated the survey as built and sent this updated file. Please <br /> compare this to the previous survey which had the footprint and measurements of the boat house. <br /> Please let me know if we can move on to the framing portion of the project. Thank you. <br /> 1 <br />