Laserfiche WebLink
I <br /> � • • 1105 Ferndale Road West, Orono, MN <br /> : . . � May 22, 2013 <br /> Page 3 <br /> 6. If a concrete washout is to be used on-site,the plans should be revised to provide a detail of the <br /> washout and show where it is to be located. <br /> 7. A record drawing of final grading elevations should be submitted after grading is complete to <br /> ensure compliance with floodplain mitigation depicted on the Grading and Floodplain Mitigation <br /> Plan. <br /> Please contact me if you have any questions or need additional information. <br /> Sincerely, <br /> BOLTON&MENK, INC. <br /> �d'�Ci'IJ�SJ"� �'<�-�� <br /> �/ . <br /> Robert E. Bean,Jr.,P.E. <br /> Water Resources Engineer <br />