Laserfiche WebLink
DETERMINING PERMIT FEES � <br /> ❑ SAC Charge(2012 Rate=$2,365.00) $ <br /> (SAC Charge must accompany all sewer permit applications unless prepaid) <br /> (Orono City Staff can determine if applicable) <br /> (If not prepaid,a sewer connection permit will not be issued) <br /> ��Sewer Connection/Disco►Yr►ect/Repair($50.00/Per Stub) $ <br /> Pipe size `1" inches;material Schd 40 air tested;_�cast iron <br /> ❑Water Connection/Disconnect/Repair($50.00/Per Stub) $ <br /> Pipe size inches; material Schd 40 air tested; copper <br /> ❑ Water Availability For Future Hook-Up to Water($50.00) $ <br /> Water Availabilit��Explanation: <br /> Contractor installed line to inside of house for future hook-up. <br /> This line will be inspected by the Public Works Department. <br /> ReQuired Before Water Connection Pernut is Issued: <br /> L Issue Water Meter&Horn Permit <br /> 2. Any Additional Connection Fees Paid(If Applicable) <br /> Issue Water Connection Permit: <br /> 1. Collect Permit Fee &Issue Water Connection Permit <br /> 1. SUBTOTAL of Pernut Requested: $ <br /> 2. STATE SURCHARGE $ 5.00 <br /> 3. POSTAGE&HANDLING(Only on Mail-In Applications) $ 2.00 <br /> 4. TOTAL PERMTT FEE (Add Lines 1-3 Above) $ <br /> ADDITIONAL 1NFORMATIOI�T—WATER METERS ' <br /> ■ WATER METERS must be picked up and paid for at Orono City Hall,these are on a separate pernut. <br /> ■ WATER METERS must be set and sealed by Orono Water Department (952) 249-4600, upon <br /> completion of ineter installation. <br /> The undersigned hereby applies to the City of Orono for issuance of a Utility Permit, a�rees to do <br /> all work in strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota, and certifies that a atements made ri5 application are, true and correct. <br /> Applicant: Date: 1� �� I Z <br /> �/ <br />