Laserfiche WebLink
Received <br /> au� o s 2o�s <br /> EROSION CONTROL SUPPLEMENTAL INFORMAT ON FORM <br /> B��: <br /> INSPECTION PLAN REQUIREMENTS --• <br /> 1. Routine Inspections: <br /> • Once every seven days during active construction <br /> • Within 24 hours of a half inch or more precipitation <br /> 2. Completed Field Inspection Reports: <br /> • Reports available within 24 hours of request until MCWD determines project is complete& <br /> stabilized <br /> Failure to submit r�equested inspection information will result in a site inspection and may be subject to <br /> reimbu��sement fo�•MCWD staff time. <br /> Who�vill inspect your site regularly? <br /> NAME: �v,r�t� .��u•} '�5 ORGANIZATION: �;r�- _(�c.,����� �jC�/'v�,.c'j <br /> PHONE: ���'��6� � �0 r� ALTERNATE PHONE: <br /> EMAIL: �} ;������I�j���rvi�.��5� ��'l�v�� < <-�'.,►1 <br /> Where is the concrete washout tocation? <br /> ❑ OFF SITE OR CONTAINED ON TRUCK <br /> ❑ INDICATED ON SITE PLAN(with required impermeable liner) <br /> � N/A <br /> What is the final stabilization method? <br /> (seed,sod, etc.): 5 oJ <br /> 6 inches of topsoil must be added/replaced prior•to final stabilization <br /> Will protective fencing for retained vegetation be installed? <br /> ❑ YES <br /> f,�," NOT APPLICABLE <br /> ❑ OTHER(describe) <br /> I certify that I am familiar with the requirements of the MCWD Erosion Control Rule and that the <br /> pro acti 'ty will be conducted in compliance with this rule. <br /> � `�' l � <br /> Signa re of Applicant or Authorized Agent Date <br /> � MINNEHAHA CREEK <br /> WATERSHED DISTRICT <br /> � OUAl1TY OF WAiER,OUALITY OF LIFF <br />