My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-00348 (acc. structure)
Orono
>
Property Files
>
Street Address
>
C
>
Casco Point Road
>
2480 Casco Point Road - 20-117-23-21-0037
>
Permits/Inspections
>
2016-00348 (acc. structure)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:52:20 PM
Creation date
9/9/2016 10:40:18 AM
Metadata
Fields
Template:
x Address Old
House Number
2480
Street Name
Casco Point
Street Type
Road
Address
2480 Casco Point Road
Document Type
Permits/Inspections
PIN
2011723210037
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Builder Acknowledgement Form <br /> Permit #2016-00348 / 2480 Casco Point Road <br /> � <br /> Builder Representative Name: n � ��"� <br /> Permit Conditions: Initials <br /> **NOTE CHANGE** Before scheduling an exterior insulation and/or drain tile inspection, a <br /> foundation as-built survey must be submitted and approved by the City or a Stop Work order <br /> will be issued. <br /> Erosion control mechanisms must be installed and inspected by the City prior to any land � <br /> disturbing activities. The contractor must provide a minimum of a 24 hour notice prior to <br /> inspection. <br /> Erosion control shall be installed and maintained throughout the entire project and must <br /> remain until vegetation has been established. i <br /> Prior to the refunding of escrow funds an as-built survey and hardcover calculations must be ' <br /> submitted and approved. <br /> Advisory Comments <br /> Any changes to the exterior/landscaping improvements, i.e. patios,grading, sidewalks, retaining <br /> walls, etc. not currently shown on the approved survey and landscaping plan will require a <br /> separate Zoning Permit application to be submitted and approved prior to the work <br /> commencing. <br /> Any retaining walls that are over 4-feet in height or tiered walls not separated by twice of the <br /> height of the lower wall require engineered plans and a building permit to be submitted and <br /> approved prior to construction. <br /> w:\street files\casco pt rd\2480\builder acknowledgement form 2016-00348.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.