Laserfiche WebLink
� � <br /> Christine Mattson <br /> From: Christine Mattson <br /> Sent: Tuesday, October 25, 2016 1:53 PM <br /> To: 'Jorj Ayaz' <br /> Cc: Stephen Rudolph; Monica Fadness; Rachel Dodge; Roger Peitso <br /> Subject: RE: 2480 Casco Point Road/#2016-00348 <br /> Jorj, <br /> We have reviewed and approved the electronic copy of the foundation as-built survey for the in-kind replacement of the <br /> boat house. You may proceed with framing. A copy of this email authorizing you to proceed should be kept on site <br /> with the inspection card. <br /> Also, please submit a full-size copy of the foundation as-built survey for our records. The electronic copy emailed must <br /> be printed on 22" x 34" paper and we are only able to print up to 11" x 17" in-house. <br /> Please don't hesitate to contact me if you have any questions. <br /> �� <br /> Christine Mattson � Qi���,�U���'� <br /> Planning Assistant � ,^ �� , �N� <br /> City of Orono ��Q�' � <br /> 2750 Kelle Parkwa i Orono ; MN ; 55356 h sical address ' ��a�� �� <br /> Y Y �p Y � �U`' �-�t <br /> PO Box 66 ' Crystal Bay ' MN 55323-0066 (mailing addressJ ��� ��' ��� <br /> ��`� �" M <br /> S' 952.249.4620 ' c=3 952.249.4616 •�j� � <br /> � cmattson@ci.orono.mn.us ; � www.ci.orono.mn.us <br /> Office Hours: Monday- Friday 8 am to 4:30 pm <br /> OUR OFFICE WILL BE CLOSED: Friday, November 11, 2016 <br /> Thursday& Friday, November 24&25, 2016 <br /> From:Jorj Ayaz [mailto:jorj@aspenshowroom.com] <br /> Sent: Sunday, October 23, 2016 10:27 PM <br /> To: Christine Mattson <CMattson@ci.orono.mn.us> <br /> Subject: Re: 2480 Casco Point Road/#2016-00348 <br /> Hi Christine, <br /> Advance surveying and engineering came out and updated the survey as built and sent this updated file. Please <br /> compare this to the previous survey which had the footprint and measurements of the boat house. <br /> Please let me know if we can move on to the framing portion of the project. Thank you. <br /> i <br />