Laserfiche WebLink
MINUTES OF THE REGULAR ORONO COUNCIL MEETING HELD MARCH 28, 1988 <br />STORM SEWER - HIGHWOOD ROAD <br />City Administrator Bernhardson introduced the <br />feasibility study that was done in response to a <br />petition by Highwood residents requesting a solution to <br />a storm water ponding problem. Within the feasibility <br />report are two alternatives for storm water piping and a <br />third alternative to redo the road to redirect the <br />drainage down the hill into a pipe. <br />City Engineer Cook reviewed the feasibility study. <br />Councilmember Sime felt that Alternative 1 was <br />preferable based on his knowledge of the drainage in the <br />neighborhood. <br />It was moved by Councilmember Sime, seconded by <br />Councilmember Peterson, to accept the storm sewer <br />feasibility report for the Highwood area as presented <br />and designate April 25, 1988 as the public hearing date. <br />Motion, Ayes 4, Nays 0. <br />FEASIBILITY STUDY - BY -PASS LIFT STATION 110 <br />Councilmember Peterson asked why the feasibility study <br />is being requested at this point in time which to her <br />seemed after - the -fact? <br />MAYOR'S REPORT: <br />City Administrator Bernhardson explained that they did <br />not want to spend the money on the study prior to an <br />agreement by the Metro Waste Control Commission to do <br />the project in the manner that would allow the City to <br />install the gravity line which is the subject of this <br />feasibility report. <br />It was moved by Councilmember Sime, seconded by <br />Councilmember Goetten, to direct the City Engineer to <br />perform a feasibility study for a sanitary sewer by -pass <br />of Lift Station #10 for an amount not to exceed <br />$2,500.00. Motion, Ayes 4, Nays 0. <br />There was no report from the Mayor. <br />10 <br />