My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MCWD Wetland Protection Rule
Orono
>
Property Files
>
Street Address
>
F
>
Ferndale Road West
>
960 Ferndale Road West - 02-117-23-44-0033 - New PID
>
960 Ferndale Rd W - 02-117-23-44-0017 - Old PID
>
Misc
>
MCWD Wetland Protection Rule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:11:23 PM
Creation date
9/8/2016 2:47:49 PM
Metadata
Fields
Template:
x Address Old
House Number
960
Street Name
Ferndale
Street Type
Road
Street Direction
West
Address
960 Ferndale Rd W
Document Type
Misc
PIN
0211723440033
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(c)Identification and area of the total watershed area presently contributing stormwater runoff to <br /> the wetland. <br /> (d)A replacement plan, if required, meeting all the requirements of Minnesota Rules chapter <br /> 8420, as amended. Replacement plans for wetland impacts not subject to the WCA must meet <br /> these same requirements. <br /> (e) For projects involving wetland excavation(including projects deemed self-replacing under <br /> paragraph 4(b)),the application shall identify spoils placement on upland and specify how the <br /> deposited materials will be stabilized and vegetated. <br /> (fl Information showing whether the subject wetland is protected by either the State or <br /> municipality or both. <br /> (g) Wetland Buffer Planting Plan, if required under section 7, Wetland Buffer Vegetation, <br /> including: <br /> (1) Proposed seed mixes and other plant materials to be used; <br /> (2) Seed or plant supplier and origin of materials; <br /> (3) Seed/planting bed preparation (i.e. disking, raking, clearing, herbicide control, <br /> topsoiling, etc.); <br /> (4) Seeding and/or planting method(i.e. broadcast, drill, etc.); <br /> (5) Application rate in either pounds of seed per acre and/or the number of plants per unit <br /> area if using plugs or seedlings. Specify if using pure live seed(PLS). Higher application <br /> rates will be required if not using PLS; <br /> (6) Detailed erosion control plan for establishing wetland buffer. <br /> (h) Wetland Buffer Maintenance Plan, if required under section 7, Wetland Buffer Vegetation, <br /> including: <br /> (1) Schedule of establishment and maintenance activities for the first five years of <br /> establishment(i.e. watering, burning,mowing, herbicide control, etc.); <br /> (2) Identification of probable invasive species and steps that will be taken to control the <br /> spread of invasive species; <br /> (3) Inspection methods and schedule for monitoring invasive species and documenting <br /> native species germination and establishment. <br /> 10. WETLAND BUFFER MONITORING. For buffer areas required to be established or replaced under <br /> subsection 7(c), setting standards for buffer establishment and maintenance: <br /> (a) Upon final establishment,wetland buffers shall contain little or no bare soil and shall e�ibit a <br /> dominance of native vegetation. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.