Laserfiche WebLink
� <br /> -4 b �3�� <br /> CITY OF ORONO APPLICATION FOR <br /> Box 66 (2750 Kelley Parkway) FIRE SPRINKLER SYSTEM PERMIT <br /> Crystal Bay, MN 55323 <br /> GENERAL INFORMAT[ON <br /> l. Permits are required for ali fire sprinkler installation and repair. All work shall be done by a <br /> licensed fire sprinkler contractor. 2 sets of plans, specification and hydraulic calculation sheets <br /> shall be submitted to the Orono Fire Marshal a mininwm of 7 davs before start of work. <br /> ?. You may apply for permits by mail or in person at the City offices. <br /> 3. Al) systerns shall be designed, installed and maintained to N.F.P.A.-13, N.F.P.A.- 25, and <br /> Minnesota State Building Code, Minnesota Uniform Fire Code and Standards. All attic systems <br /> are to be spaced at a maximum of l30 square foot coverage. Plastic pipe will not be allowed <br /> at any tirne in attic spaces. <br /> 4. Afi equipment installed shall be U.L. or F.N1. approved ror fire protection service. <br /> 5. Yard or wall post indicator valves are required. All indicting and control valves installed shall <br /> be provided with tamper protection. On dry systems, the control valve to service the pressure <br /> switch (air) shall be supervised. <br /> G. Inspectors test valves shall be installed on each floor �evel or zone of system. Main drain and <br /> inspectors test valves shall be piped to the outside. <br /> 7. No water is to be introduced into the sprinkler system until main had been thoroughly flushed. <br /> Air test and flushing shall be witnessed by City of Orono Water Department. <br /> 8. An approved audible/visual device wired to main flow switch shall be installed above the Fire <br /> Department connection and in areas normally occupied by tenants. <br /> 9. EXISTING SYSTEMS: If any changes in the hydraulically most demanding area, change in <br /> occupancy classification or addition of 20 or more heads, hydraulic calculations and flow test <br /> will be required. <br /> 10. All final flow or trip tests shall be witnessed by the Orono Fire Marshal. Appointments can be <br /> made by calling Orono City offices, (G 12)249-4600. 24-hour notice required. <br /> 11. ALL WORK (rough-in and final) MUST BE INSPECTED. PERMITS ARE NOT VALID <br /> UNTIL YOU RECENE A PERMfT AND JOB-SITE CARD. Call (612)249-4600 24-hours <br /> in advanced to schedule your inspections. <br /> lnstructions Complete all items on this application. Compute the permit fee. Sign and date the <br /> certification. IIvCON►YLGT�, APPLiCATfONS WILL NOT BE PROCES�EG. (f you have yuestions, <br /> call (952) 249-4600. You will be notified by phone when the permit review is completed. Permit will <br /> be issued to contractors at the City offices (2750 Kelley Parkway). <br /> / <br /> Please check on,e�. �_New Addition Remodel Replace <br /> �o- <br /> � <br /> JOB SITE: � �� /L' f /� Zip: ; ' I <br /> Owner's Name: �+. r= i,,,,�, J ► ;"f �. ,_. ' ����-� Telephone Number: <br /> Mailing Address: -,.- City: Zip: <br /> Sprinkler Contractor:/� . rt,�'_;,_ � > . . �, t,Telephone Number: `� � <br /> Contractor's Address: �i4�i�, �� - d �� City: ;% Zip: , -+' <br /> Contact Person: U f� Phone Number: •!7+,� ���r 3 -, i � <br /> (Circle one: Cell, PagerN-Office) <br />