Laserfiche WebLink
CITY OF ORONO � O� <br /> Municipal Offices O � O <br /> Post Office Box 66 <br /> Crystal Bay, MN 55323-0066 � � ON—SITE SEWAGE TREATMENT <br /> r�, �, INSPECTION REPORT <br /> ti <br /> ���kESH�4'�G <br /> Owner: 1�(��(1'� � �`L Address: i / <br /> Permit #'s• r/��Dates:� Contractors• � <br /> City ordinance number 100 requires that each on-site sewage treatment system in Orono be inspected on a regular basis. <br /> The on-site sewage treatment system at the above address has been inspected and appears to fall into the category <br /> checked belou. <br /> (This is [�l. an existing system [ ] new construction) <br /> SYSTEM CONFORMITY (1-3): <br /> 1 "CODE SYSTEM��-A system which meets all the location, design, and construction standards of the current City <br /> Codes, and which is operating satisfactorily by treating and disposing of the entire current sewage input <br /> � without discharging any pollutants into ground or surface waters. <br /> "CONFORMING SYSTEM"-A system which does not meet all the location, design, and construction standards of the <br /> current City Codes, but uas installed according to the code in effect at the time of installation, and which <br /> is operating satisfactorily by treating and disposing of the entire current sewage input without discharging <br /> any pollutants into ground or surface uaters. <br /> 3 "NON-CONFORMING SYSTEM"-A prohibited system; a system located within a designated 100-year floodplain; any <br /> system which may or may not meet all the location, design, and construction standards of the current City <br /> Codes and which is failiny for any reason; and any system with less than 3 feet of unsaturated soil or sand <br /> betueen the distribution device and the limiting soil characteristics. <br /> � (The limiting soil characteristic� has or [ ] has not been identified at this time. If the limiting soil <br /> characteristic has not been identified, this classification may be subject to revision.> <br /> TANK CONDITION (5-10): <br /> Tank inspection indicates: <br /> � Pixnpout not needed at this time. <br /> cumulat' � ' he should be ed out r el revent future problems. <br /> Solids accumu ation in tanks is at a critica eve . an s s ou d be pumped out as s t---' <br /> 8 System is discharging to the surface. Tanks must be pumped out uithin 48 hours to eliminate surface discharge. <br /> 9 Inspection risers missing-tanks could not be inspected. ]nspection risers (4" dia. pipe) must be installed in each <br /> tank at next purtipout. If tanks have not been pumped out uithin the last three years, they should be pumped <br /> out now. <br /> 10 ]nspection pipe is located directly over tank baffle (does not give accurate measurement of solids acc�nnulation). <br /> If tanks have not been punped out within the last three years, they should be pumped out now. <br /> DRAINFIELD CONDITION (11-14): <br /> D�field insPection indicates: <br /> 11 Drainfield is dry, no surfacing evident. <br /> Some evidence of surfacing, not critical yet. <br /> 13 Drainfield is saturated and visibly discharging untreated effluent to the surface. Contact the City Inspector <br /> irtmediately. Repairs must be completed uithin 90 days. <br /> 14 Drainfield extent and condition unknown. <br /> LIMITING SITE fACTORS (slope,setbacks,etc.): <br /> POTENTIAL FOR SYSTEM FAILURE (depends on soils,water table,etc.): /��y1�� <br /> �� <br /> OMMENT : �� C <br /> � <br /> � ! - ret�� <br /> s <br /> Date of Znspection p ic System Inspector <br /> Note: In the event that this inspection report is used to satisfy the requirements for a mortgage or other transfer of <br /> property, be advised that this report does not guarantee or certify that an existing system will continue to function <br /> properly� but is merely an opinion of the adequacy of the system under current conditions based on the available <br /> information. <br /> This report must be kept on the pre�nises with the system loc=_tion and pumping records. <br /> WHITE COPY/Inspectors File YELLOW COPY/Homeowner <br />