Laserfiche WebLink
� ; <br /> . = B O l_TON 8� M �N K , I N C� <br /> . I Consulting Engineers & Surveyors <br /> " � 2638 Shadow Lane, Suite 200• Chaska, MN 55318-1172 PC Exhibit I <br /> Phone(952)448-8838• Fax(952)448-8805 <br /> . www.bolton-menk.com <br /> January 30,2012 <br /> RF���V <br /> City of Orono <br /> FFB o �a <br /> Attn: Melanie Curtis 2?��? <br /> PO Box 66 C��'pF <br /> Orono, Mn 55323 �RQNO <br /> RE: Zoning Application 12-3544 <br /> 1165 Ferndale Road West House Construction <br /> Dear Melanie: <br /> As requested,we have reviewed the submittal package, dated January 18,2012,for the proposed house <br /> construction at 1165 Ferndale Road West. Based on our review,we offer the following comments for <br /> your consideration: • <br /> l. This project will disturb more than 100 cubic yards of material. Therefore, a Storm Water <br /> Pollution Prevention Plan(SWPPP)must be submitted for review in accordance with Sec. 79 of <br /> the City Code. The minimum$2,000 sediment and erosion control financial security should also <br /> be required of the owner for this permit. <br /> 2. Hardcover calculations must be submitted demonstrating compliance with the City's Hardcover <br /> requirements. <br /> 3. The proposed house appears to be partially located within 75' setback zone from the lake. <br /> However,the existing house was located further into the setback. <br /> 4. Existing drainage patterns need to be maintained to avoid unforeseen drainage issues on adjacent <br /> properties. <br /> 5. Lot grading is proposed below the 100-year floodplain elevation(931.5'). Volume calculations <br /> must be submitted demonstrating no net loss of floodplain volume. <br /> 6. The wetland area shown on the west side of the property is listed as a"Preserve" level wetland, <br /> which requires a 50' setback. The plans should be adjusted accordingly. <br /> 7. The applicant will be required to obtain Minnehaha Creek Watershed District approval of the <br /> wetland delineation. A copy of the approval should be submitted to the City after MCWD <br /> approval. <br /> 8. The applicant will be required to obtain a Minnehaha Creek Watershed District permit for erosion <br /> control. A copy of the permit should be submitted to the City after MCWD approval. <br /> Please contact me if you have any questions or need additional information. <br /> Sincerely, <br /> BOLTON &MENK,INC. <br /> �� � . <br /> David P. Martini <br /> Principal Engineer <br /> H:\ORNO\C13104528\1 Corres�Docs\1165 Femdale Rd W review 2012-01-30.doc <br /> DESIGNING FOR A BE�ER TOMORROW <br /> Bolton&Menk is an equal opportunity employer <br />