Laserfiche WebLink
Builder Acknowledgement Form <br /> � � Permit #2016-00725 / 3800 Casco Avenue <br /> Builder Representative Name: ��'„��--:� <br /> Permit Conditions: Initials <br /> **NOTE CHANGE** Before scheduling an exterior insulation and/or drain tile inspection, a <br /> foundation as-built survey must be submitted and approved by the City or a Stop Work order /�/� �l <br /> will be issued. <br /> Schedule a minimum of one hour for the framing inspection. rv,l �� <br /> Erosion control mechanisms must be installed and inspected by the City prior to any land <br /> disturbing activities. The contractor must provide a minimum of a 24 hour notice prior to �1�� �l <br /> inspection. <br /> Erosion control shall be installed and maintained throughout the entire project and must r, 1�� <br /> remain until vegetation has been established. <br /> A haul route shall be submitted to the City Engineer for approval and inspection prior to <br /> commencement of hauling from the site.The property owner shall be responsible for cleaning :"��L� <br /> and repair of roadways for any adverse impacts. <br /> No underground sewer within 20 feet of well. �V�� ) <br /> 1l <br /> Prior to the issuance of a Certificate of Occupancy an as-built survey and hardcover calculations <br /> must be submitted and approved. �ti1�""l <br /> In the event of winter or other extended unfavorable weather conditions (which prevent the <br /> completion of the exterior improvements and/or as-built survey) a Temporary Certificate of ��v l.�.(� <br /> Occupancy(TCO) may be necessary. A TCO requires a $10,000 escrow. <br /> Advisory Comments <br /> Any changes to the exterior/landscaping improvements, i.e. patios, grading, sidewalks, retaining <br /> walls, etc. not currently shown on the approved survey and landscaping plan will require a 1 <br /> separate Zoning Permit application to be submitted and approved prior to the work �l. � <br /> commencing. <br /> Any retaining walls that are over 4-feet in height or tiered walls not separated by twice of the <br /> height of the lower wall require engineered plans and a building permit to be submitted and i-l��,l <br /> approved prior to construction. <br /> w:\street files\casco ave\3800\builder acknowledgement form2016-00725.docx <br />