My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-21-2012 Planning Commission Packet
Orono
>
Planning Commission
>
2012
>
02-21-2012 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2012 4:23:01 PM
Creation date
8/20/2012 4:22:44 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PC Exhibit D <br /> City of Orono- Conservation Design Check List <br /> BASIC APPLICATION AND PLAN REQUIREMENTS <br /> Sec. 78-1634.Application requirements and procedures. <br /> Item Development Steps Action Item <br /> Review and provide written response to the Goals and Policies for Environmental <br /> Protection and Natural Resource Management as established in the Orono <br /> 1. Community Management Plan and the recommendations contained within the NA <br /> Orono Natural Resources Inventory. The intent is to establish the properly's <br /> ecological connections both within Orono and as part of the regional ecological <br /> s stem. <br /> 2. Rural Oasis Study <br /> If the properly exists adjacent to a documented corridor in the Rural Oasis Study, <br /> review and respond to the existing aesthetic and ecological analysis. NA <br /> If the property is not adjacent to a documented corridor in the Rural Oasis Study, <br /> • developer shall have a qualified consultant prepare a similar analysis and submit it <br /> to the city for review.This analysis shall include the documentation of: <br /> a. views, <br /> b. corridor enclosure, <br /> c. and landmarks through a plan analysis and photographs. NA <br /> Deve%per shall be charged a standard fee established in the city fee schedule to <br /> cover the expenses of the city in hiring a consultant to review the eco%gical site <br /> analysis submitted by the deve%per. <br /> 3. Natural Resource Inventory. <br /> Include all of the following elements: <br /> a. Review and document the MLCCS data pertinent to the site. * <br /> b. Tree survey <br /> Include all significant individual trees g�eater than six feet diameter, and ** <br /> stands of trees, identifying tree species and size. <br /> c. Wetland inventory and Wetland Buffer *** <br /> Include delineation re orts. <br /> d. Topographic survey NA <br /> Include existing drainage patterns. — <br /> e. Site Analysis <br /> Analysis of the site based on the findings and�ecommendations of the <br /> Orono Natu�a/Resources Inventory with regards to: . <br /> , • Conceptualg�eenways and open space corridors; <br /> •Existence of rare plant communities; <br /> •Potential need for proactive management and <br /> p�otection. <br /> C:\Users\mcvrds\AnoData\Lom�MiwsoftlWindowslTemoorarv Intemet Flles\Gontent.0utlook\ZOZACOSG1ConsenraHon Desian Check Llst.dooc Pane 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.