My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-010944 - septic
Orono
>
Property Files
>
Street Address
>
F
>
Ferndale Road North
>
781 Ferndale Road North - 36-118-23-11-0013
>
Permits/Inspections
>
1998-010944 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:00:31 PM
Creation date
9/6/2016 2:16:41 PM
Metadata
Fields
Template:
x Address Old
House Number
781
Street Name
Ferndale
Street Type
Road
Street Direction
North
Address
781 Ferndale Road North
Document Type
Permits/Inspections
PIN
3611823110013
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.Q„ O� CITY OF ORONO <br /> Y � SEPTIC S�TSTEM APPROVAL <br /> O .� O '� <br /> _ � � �i <br /> ����� �� ITY of ORO�1'O <br /> �,, x:,t, <br /> ,r3 } �� �S ►�r ��:'��:. <br /> ,';..J <br /> � t�� ��,i�:.;=- � ��ja NtunkipalotTices <br /> �� � � '� �`�.J���;'� �, Post Office Box 66 � <br /> L �� �°�� ��G c���y,M;t��c�ss3z3-oo� <br /> �kESH�� <br /> LOCATION: 781 Ferndale Rd. N. <br /> OWNER: Kevin Tapani <br /> GENERAL CONTRACTOR: SEPTIC CONTRACTOR: <br /> SITE EVALUATOR: Swedlund Septic Service REPORT DATE: .7uly 30, 1998 <br /> The City of Orono has Approved your on-site system design as of July 30, 1998 <br /> (approved-disapproved) (date) <br /> with the following conunents: <br /> THIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit must <br /> be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is <br /> enclosed. <br /> NOTICE TO INSTALLERS: Any changes to ttie approved plans and specs must have prior approval of the <br /> Inspector (473-7357). Call for inspections 24 hours in advance. <br /> ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain <br /> in place until final site grading. Approval to pour footings will not be granted until tlie Inspections Department <br /> has verified that primary and alternate sites are adequately protected. <br /> NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, e�c.) is allowed within 20' <br /> of tested drainfield sites either before or after system construction. Compaction of these areas could render them <br /> unusable prohibiting the timely completion and or limiting the long term use of the property. <br /> A site copy will be available at the City Offices for the septic contractor. <br /> CITY OF � NO � <br /> By <br /> Stephen ckman, On-site Systems Manager <br /> TELEI'I iONE-473-7357•FAX-473-0510 <br />
The URL can be used to link to this page
Your browser does not support the video tag.