My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-P06867 - septic
Orono
>
Property Files
>
Street Address
>
F
>
Ferndale Road North
>
725 Ferndale Road North - 36-118-23-12-0002
>
Septic
>
2003-P06867 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:00:59 PM
Creation date
9/6/2016 12:09:06 PM
Metadata
Fields
Template:
x Address Old
House Number
725
Street Name
Ferndale
Street Type
Road
Street Direction
North
Address
725 Ferndale Road North
Document Type
Septic
PIN
3611823120002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
View images
View plain text
,� , • <br /> CITY OF ORONO SEPT'IC SYST'E�I PERNIIT APPLICATION <br /> Bos 66 (2750 Kelley Parkway) <br /> Crystal Bay, Mn 5�323 <br /> � <br /> JOB STTE ADDRESS ��� ��^�� ��- `� �� �(� <br /> Occupancy Type: Residential � Commercial Other <br /> Permit Type: New or Replacement System $100.00 %QC�� �� �J <br /> Repair Existing System $ 50.00 <br /> (Tanks or Drainfield) <br /> $0.50 State surcharge added to above fees <br /> * See fee schedule for non-residential permit fees <br /> Owner's I\'ame: �`� � \�� SS� S� �-.��-��--ys Phone Number: <br /> Nlailing Address: 72 � I�r.-� �.�- '�o�• �1�� City: 6:c,�� (j Zip: <br /> Contractor's Name: �n��le�,� � `�-�� Phone Number: �� 7 i- l � � �j <br /> Mailing Address: � C �3 �.x I2 -7 City: Lc �z t�-c. Zip: 5 S �;� <br /> *** DO NOT NIAIL PAYMENT`VITH THIS APPLICATION*** <br /> GENERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in person <br /> at the City Offices and work must not begin unless the permit card is on the job site. <br /> 2. Permits will be issued only to contractors holding a Minnesota Pollution Control <br /> Agency(Ml'CA) Septic System Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design reports <br /> are not considered approved unless accompanied by the "City of Orono Septic System <br /> Approval" cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required after <br /> roujh up but prior to sand placement(sand will be jar tested for silt content), and again <br /> durin; pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump stations <br /> (where required) components are functional and comply with codes. � <br /> 5. Individual holdin�1�Il'CAInstallers License shall be present during all inspections. A 24-hour <br /> notice is required for all inspections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).