My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-19-2011 Planning Commission Packet
Orono
>
Planning Commission
>
2011
>
09-19-2011 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2012 4:34:27 PM
Creation date
8/15/2012 4:34:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. t ` } <br /> ,:; _ � <br /> FILE#11-3524 <br /> 14 September 2011 <br /> Page 4 of 4 <br /> The applicants' request is consistent with the surrounding neighborhood. The proposed <br /> addition will meet the required side yard setback. The proposed addition will only add an <br /> additional 425 square feet of structural coverage to the property resulting in a total of 7.6% <br /> structural coverage. The planning commission should determine if the addition of a garage stall <br /> with living space above falls within the definition of practical difficulty. <br /> Issues for Consideration <br /> 1. Does the Planning Commission �nd that that the property owner proposes to use the <br /> property in a reasonable manner which is not permitted by an official control? <br /> 2. Does the Planning Commission find that the variance, if granted, will not alter.the <br /> essential character of the neighborhood? <br /> 3. Does the Commission find the applicants' proposed mitigation methods sufficient <br /> or is it necessary to impose additional conditions in order to mitigate the impacts <br /> created by the granting of the requested variances? <br /> 4. Does the Commission find it necessary to require easements over the proposed rain <br /> garden and wetland mitigation area to protect the areas in perpetuity? <br /> 5. Are there any other issues or concerns with this application? <br /> Staff Recommendation <br /> The Planning Commission should review and discuss the variance to determine if a practical <br /> difFiculty exists which supports the granting of the requested variance. A recommendation to <br /> the City Council should be based on these conclusions. Further Planning Staff recommends the <br /> applicants be required to comply with the City Engineer's recommendations as well as <br /> requirements from the Minnehaha Creek Watershed District as part of any approvals. <br />
The URL can be used to link to this page
Your browser does not support the video tag.