Laserfiche WebLink
, � � t, ' ����(�l <br /> v6 <br /> Concept Landscaping <br /> 3153 Priest Lane <br /> Mound,MN 55364 <br /> Koch hillside soil movement and fill requirements; Restore Hillside. <br /> Material movement; cubic yards <br /> Remove old timber walls and steps 120 timbers -8.89 <br /> Install new timbers in sub-terrainian system 117 timbers 8.67 <br /> Install filter rock 10.67 <br /> Soils movement <br /> Remove soils for walls and tiebacks - 30.14 <br /> Reinstall soils 19.69 <br /> Total soil and material movement 39.03 cubic yards. � <br /> Excess soils to be used below - 10.45 <br /> Fill hillside stair and wall area to restore natural slope; . <br /> Section 1 —see survey � 2.67 <br /> Section 2—see survey 3.50 <br /> Section 3 —see survey � 3.11 <br /> Section 4—see survey 2.96 <br /> Section 5—see survey 3.56 <br /> Section 6—see survey 2.67 <br /> - NET result—haul in 8 cubic yards of soil <br /> � RECEIVED <br /> AUG 0 5 2011 <br /> CITY OF ORONO <br />