My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-18-2011 Planning Commission Packet
Orono
>
Planning Commission
>
2011
>
07-18-2011 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2012 4:04:37 PM
Creation date
8/15/2012 4:04:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Payment shall be due to the City at the �ime of execution of this Agreement as its Park <br /> Dectica�aon Fee for Lot l, Block 1, and Lot 2, Biock 2. Na Parrk Dedication Fees are due for Lot <br /> 1 or Lot 3,Block 2, as those lots have previausly been developed and appropriate fees paid. <br /> 19. SUMMARY OF �`EES .AND CASH REQUIREMENTS. The following is .a <br /> summary of the fees and cash requirements under this Agreement which must be furnished to the <br /> City at the time indicated: <br /> FEE or CHARGE Date Pavabie <br /> Storm Water and Drainage Trunk Fee Before Plat release <br /> Park Dedication Before Plat release <br /> SAC and WAC With Building Pernut <br /> MCES charges With Building Permit <br /> . Escrow for City Expenses/Engineering/Legal Before Plat release <br /> TotaI Cash Requirements before Plat release $229,864.00 <br /> 20. SPECIAL PRUVISIONS. The following special provisions shall apply to the <br /> development of the platted property and the Public Improvements: <br /> A. Before the fust new build.ing is occupied, the draina.ge from'the existing <br /> . parlang Iot onto pxoperty in the Orono Industrial Pazk subdivision sha1l be redirected to remain <br /> within the Plat until it enters the public drainage system, <br /> B. The conditional use pernnit for outdoor storage (#01-2612 ) shall be <br /> revised to relocate the outdoor storage prior to construction of Orono Industrial Boulevard or . <br /> issuance of a building perxnit far Lot 1,Block 1. <br /> C. Construction traffic access and egress for gradiu�g, public utility <br /> construction, and street construc�ion is restricted to access #he,subdivision via Old Crystal Bay � <br /> Road or Wayzata Boulevard <br /> D. Construction hours are 7 AM to 10 PM Monday tiu�ough Saturday. <br /> RE����/�D <br /> �32zs���� �� JUN 21 2011 <br /> n..= <br /> - - 12- �t!r?� <br /> ''!! ,._. J. ClT1P O�CyF2(�NQ <br />
The URL can be used to link to this page
Your browser does not support the video tag.