Laserfiche WebLink
• � ` � <br /> CITY OF ORONO APPLICATION FOR MECHANICAL PERMTT <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 <br /> GENERAL INFORMATION <br /> 1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be <br /> reviewed and a permit will be issued within 2 working days. <br /> 2. Permit cards wiil be sent by retum mail after a review is completed. PERMITS ARE NOT VALID <br /> UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS <br /> POSTED ON THE JOB SITE. <br /> 3. Mechanical Designs - Complete calculations, details and specifications are required for each heating, <br /> ventilation,humidification-dehumidification, and air conditioning instaliation including heat loss/heat gain <br /> calcuiation, dcsign temgerstn�es, eq�.!ip:nent ratings and identification as to type, manufacturer and model. <br /> Data shall be presented on form provided. Ideatification of and specifications for water heating equipment <br /> shall also be provided. <br /> 4. When any new construction or remodeling is involved, a separate building permit must be obtained. <br /> 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code <br /> requirements. <br /> 6. All work must be inspected (rough-in and final). Call 473-7357. 24-hour notice required. <br /> 7. House Heating Test Record must be submitted before final. <br /> Instructions Complete all items on this application. Compute the permit fee. Sign and date the certification. <br /> INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call 473-7357. <br /> Please check one: New Addition Repair � Replace <br /> � Residential Co cial <br /> JOB Si7`E: � I ZaF: <br /> Owner'sName: � L. C( TelephoneNumber: <br /> Mailing Address: U11(;T uonrlNG d A{R CONDITIOMING City: Zip: <br /> Contractor'sName: s2so eoRt�M AVE. TelephoneNumber: <br /> MailingAddress: ��,« ' R� c 5426 n ,ni� City: Zip: <br /> s2s-6,�-oERW6E��-��-- <br /> SYSTEM DESCRIPTION <br /> HEATING SYSTEMS <br /> Quantity: <br /> Make: <br /> Model: <br /> Fuel: <br /> Flue Size: <br /> Input BTUs: <br /> Output BTUs: <br /> CFM: <br /> COOLING SYSTEMS I <br /> Quantity: <br /> Make: <br /> Model: ( <br /> Tor,s: � <br /> H. Power <br />