My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-16-2011 Planning Commission Packet
Orono
>
Planning Commission
>
2011
>
05-16-2011 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2012 3:48:35 PM
Creation date
8/15/2012 3:48:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FILE#11-3506 <br /> 12 May 2011 <br /> Fage 2 of 2 <br /> Sec. 78-968. Permit. <br /> � An application for a conditional use permit shall be accompanied by a drawing made by a <br /> registered surveyor or other competent person showing the location of the proposed excavation <br /> orstorage and shall state the amount of material which is to be removed, excavated orstored, <br /> filled or graded, and such other information as the council may require.Applications shall be <br /> filed with the city administrator and shall be accompanied by a deposit to be determined by the <br /> city, which will be used to offset the cost of processing the application.Any unused portion will <br /> be refunded to the applicant. <br /> Background <br /> The Orono Schools intend to improve an area of the southernmost property on campus for a <br /> new softball field. As a result of the City's Old Crystal Bay Road project there will be soil <br /> material exported out of the roadway area. The school would like to utilize the excess material <br /> to improve the grade to prepare for the new softball field. Due to the amount of material <br /> proposed,a conditional use permit is required. <br /> Issues for Consideration <br /> Are there any other issues or concerns with this application? <br /> Staff Recommendation <br /> Planning Staff recommends approval of the CUP. All of the City Engineer's requirements <br /> including erosion control measures will be addressed with the administrative land alteration <br /> permit following CUP approval. The school should notify the MCWD of their project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.