My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-22-2011 Planning Commission Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2010-2019
>
2011
>
02-22-2011 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2012 3:39:06 PM
Creation date
8/15/2012 3:38:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. � T � <br /> • i <br /> • ' i <br /> � O� i <br /> � O � <br /> . � CITY of UR�N� ; <br /> � � � :. � . : <br /> ti : <br /> ti <br /> RES�LUTIQN OF THE CITY COUNCiL <br /> ��`��'ESYiog'�G � NO. 5 � 4 $ ' • _ i <br /> ` C. Private Raad Sfandards. • ; <br /> 1) The new road serving fhe development shall be constructed as a private road. � <br /> The road shail have a rural desigr�, and shall have a paved width of24'. <br /> 2) Appropriate street, traffic and parking signage including required stop signs <br /> within the parking lots and foading areas to ensure safe parking areas and <br /> pedestrian crossing within the development shafl be installed by the Developer <br /> subject to rsview and approval by Orono staff and City Engineer. <br /> 3) A monument sign may be provided by the Developer at fihe entrance�to the site. <br /> The signage shall be fimited to the facility name, address and/or iogo on the <br /> monumenf sign. Final design/materiafs of monument signage shall be subjecf to <br /> fhe requirements in City Code 78-1466(11)and approval by the City Council. <br /> D. Utitifies; Sfiormwater Management � <br /> 1} Sanitary sewer and municipal water cannections shall be instalEed by the , <br /> Developer per plans subject to approval by the Cify Engineer. The City will . <br /> ' inspect these systems during their construction to ensure proper instaAation. <br /> 2) Developer shall provide suitab{e evidence of Minnehaha Creek Watershed <br /> District (MCWD) appraval of fhe stormwafer management pEan before <br /> Development Pfan Approval will be granted. The stormwater drainage system will <br /> . be owned and maintained by the Devefaper. <br /> � E. Wetland fmpacts <br /> 1) Developer shafl demonstrate to the satisfaction of the City Counci( that all <br /> requirements of the Minnehaha Creek Watershed District as administrator of the <br /> WCA regufations on Orono's behalf are met. <br /> 2) Developer will conform to Orono's wetland, wetland buffer and buffsr setback <br /> requirements within Municipai Code, Chapter 79, Ar�icle XI Wetlands Protecfion. <br /> Any proposed wetEand and wetland buffer impacts shall be mitigated accarding to <br /> the requirements of the appficable codes and laws. <br /> F, Grading, Erosion Control <br /> 9) Erosion control shall adhere to Orono Municipal Code, Chapter 79 regarding <br /> Constru�tion Site Runoff. All erosion controls as required by the City and the <br /> MCWD shall be in place prior to commencing excavation on the site. AII such <br /> Page 8 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.