My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-18-2011 Planning Commission Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2010-2019
>
2011
>
01-18-2011 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2012 3:32:49 PM
Creation date
8/15/2012 3:32:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(4) Relocation. No nonconfornung structure shall be moved to another lot or <br /> to any other part of the parcel of land upon which the same was <br /> constructed at the time of this section�adoption unless such movement <br /> shall bring the nonconformance into compliance with the requirements of • <br /> the Zoning Code. <br /> (5) Prior permit. Any proposed structure which will,under this section, <br /> become nonconforming but for which a building permit has been lawfully <br /> granted not more than six months prior to the effective date of this section, <br /> . may be completed in accordance with the approved plans;provided <br /> construction is started within six months of the effective date of this <br /> section, and continues to completion within two years. Such structure sha11 <br /> thereafter be a legally existing nonconforming structure. <br /> SECTION 4. Effective date. This ordinance shall be effective upon adoption and publication <br /> according to law. � . <br /> ADOPTED this day of , 2011 by the Orono City Council. <br /> CITY OF ORONO <br /> James M. White, Mayor <br /> ATTEST: <br /> Linda S. Vee, City Clerk <br /> 155029v1 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.