Laserfiche WebLink
�' Giertsen Company <br /> ��-r"� Restoration Specialists Since 1918 <br /> 8385 lOth Ave North <br /> Golden Valley,MN 55427 <br /> MN License# 1796 <br /> CONTINUED-Dining Room <br /> DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL <br /> 101. Remove Acoustic plaster over 44.50 SF 0.97 0.00 0.00 8.64 51.81 <br /> 1/2"gypsum core blueboard <br /> 102. Remove Batt insulation-4"-R11- 44.50 SF 0.21 0.00 0.00 1.88 11.23 <br /> unfaced batt <br /> 103. Batt insulation-4"-R13- 59.33 SF 0.00 0.55 1.42 6.80 40.85 <br /> unfaced batt <br /> 120. Polyethylene vapor barrier 59.33 SF 0.00 0.24 0.22 2.88 17.34 <br /> 104. Acoustic plaster over 5/8" 403.80 SF 0.00 6.85 55.82 564.36 3,386.21 <br /> gypsum core blueboard <br /> 105. Texture drywall-smooth!skim 140.06 SF 0.00 0.81 1.02 22.90 13737 <br /> coat <br /> 106. Oak flooring-select grade-no 154.07 SF 0.00 8.07 57.84 260.22 1,561.40 <br /> finish <br /> 107. Interior door-solid oak-paneled 1.00 EA 0.00 452.40 25.80 95.64 573.84 <br /> -pre-hung unit <br /> 108. Door knob-interior-Deluxe 1.00 EA 0.00 99.69 5.97 21.14 126.80 <br /> grade <br /> 109. Baseboard-4 1/4"hardwood 66.52 LF 0.00 5.41 17.32 75.44 452.63 <br /> 110. Base shoe-hardwood 66.52 LF 0.00 1.48 3.44 20.38 122?7 <br /> 111. Casing-oversized-3 1/4" 16.00 LF 0.00 3.62 3.32 12.24 73.48 <br /> hardwood-molded w/detail <br /> 112. Mask and prep for paint-plastic, 73.52 LF 0.00 0.92 1.23 13.76 82.63 <br /> paper,tape(per LF) <br /> 113. Seal&paint baseboard,oversized 66.52 LF 0.00 1.60 0.97 21.48 128.88 <br /> -three coats <br /> 114. Paint door slab only-2 coats(per 2.00 EA 0.00 21.78 0.88 8.90 53.34 <br /> side) <br /> 115. Seal&paint wood window(per 1.00 EA 0.00 38.68 0.36 7.82 46.86 <br /> side) <br /> 116. Seal&paint door/window trim& 4.00 EA 0.00 22.03 1.15 17.86 107.13 <br /> jamb-(per side) <br /> 117. SeaUprime then paint the walls 681.58 SF 0.00 0.84 11.40 116.78 700.71 <br /> and ceiling twice(3 coats) <br /> 118. Sand,stain,and finish wood floor 140.06 SF 0.00 3.80 8.56 ]08.16 648.95 <br /> 119. Final cleaning-construction- 140.06 SF 0.00 0.19 0.00 5.32 31.93 <br /> Residential <br /> Totals: Dining Room 196.72 1,392.60 8,355.66 <br /> ROBSON-2 9/22/2014 Page: 9 <br />