My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-18-2016 Planning Commission Packet
Orono
>
Planning Commission
>
2016
>
07-18-2016 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:40:49 PM
Creation date
8/25/2016 2:49:34 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
right to deny a building permit for proposed solar energy systems deemed to have <br /> inadequate certification. <br /> 2. 7he equipment or device must be designed and constructed in compliance with all <br /> applicable building and electrical codes, and (if for co-generation} must be in <br /> compliance with all state and federal regulations regarding co-generation of energy. <br /> b. Utility connection. All grid connected systems shall have an agreement with the local utility <br /> prior to the issuance of a building permit. A visible extemal disconnect must be pravided if <br /> required by the utility. <br /> (4) Abandonment. If the solar energy system remains nonfunctional or inoperative for a continuous <br /> period of one year, the system shall be deemed to be abandoned and shall constitute a public <br /> nuEsance. The owner shall remove the abandoned system at their expense after a demolition <br /> permit has been obtained. Removal incEudes the entire. structure including transmission <br /> equipment. <br /> (5) Permits.A buifding permit shall be obtained for any solar energy system prior to installation. <br /> Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.