My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-20-2016 Planning Commission Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2010-2019
>
2016
>
06-20-2016 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 2:45:33 PM
Creation date
8/25/2016 2:27:32 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE . <br /> ORONO PLANNING COMMISSION MEETING <br /> Monday,May 16,2016 <br /> 6:30 o'clock p.m. <br /> 2. The applicant must comply with all required permits, including the Minnehaha Creek Watershed <br /> District; <br /> 3. The applicant must protect the existing mature trees on the property beyond the scope of the <br /> grading; and <br /> 4. The applicant must protect the integrity of the bluff and bluff vegetation. <br /> The Planning Commission had no questions for Staff. <br /> Mark Hauri, landscape architect, stated he is working with Stonewood on this property, and that he would <br /> be able to answer any questions the Planning Commission may have. <br /> Thiesse stated he did walk the property and that it appears that the berm to the southerly side is the <br /> highest portion of the land and that the berm in the middle does not appear to be there. <br /> Hauri stated the berm in the middle will eventually get done. Hauri stated when the driveway apron is <br /> excavated, more fill will be generated and will create the middle berm. The southern berm will be <br /> completed with the fill that is on site currently. <br /> Thiesse asked if the swale will also be completed. <br /> Hauri indicated they are going to be grading that out hopefully by the end of the week if it dries out. <br /> Schoenzeit asked if any imported material will be required. <br /> Hauri stated all imported materials in terms of large quantities of dirt will consist of three more trucks of <br /> top soil when the sod is completed on Lot 1. Hauri indicated that should be the only imported fill and that <br /> no more fill is needed to build berms. The driveway will have ballast placed on it. The proposed <br /> driveway is not there currently but the grading for it has been completed. Hauri indicated they are <br /> currently using a construction entrance, which will be closed in approximately three weeks, and that they <br /> will likely need three to four loads to complete the driveway. Then in the late fall a single lift of asphalt <br /> will be put down, with the final coat being put down next spring. <br /> Chair Thiesse opened the public hearing at 6:37 p.m. <br /> There were no public comments regarding this application. <br /> Chair Thiesse closed the public hearing at 6:37 p.m. <br /> Schoenzeit moved,Landgraver seconded, to recommend approval of Application No.#16-3826, <br /> Stonewood,LLC, on behalf of Chuck and Terri Lahr,895 Tonkawa Road,After-the-Fact <br /> Conditional Use Permit, subject to recommendations of the City Engineer and Staff. <br /> VOTE: Ayes 6,Nays 0. <br /> 3. #16-3827 RICK DENMAN ON BEI�ALF OF DDK, LLC,2525,2535,AND 2545 <br /> SHADYWOOD ROAD, SKETCH PLAN, 6:38 P.M.—7:12 P.M. <br /> Page 2 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.