My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-15-2010 Planning Commission Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2010-2019
>
2010
>
11-15-2010 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2012 4:43:23 PM
Creation date
8/14/2012 4:43:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� r <br /> , L -• <br /> 10-3489 " <br /> 9 November 2010 <br /> Page 2 of 2 <br /> Conformance with Zoning Ordinance <br /> , Currently, both of the lots meet the area and width requirements of the RR-1 B Zoning <br /> District. After the lot line rearrangement, the finro lots will remain conforming. The <br /> proposal to move the common (side) lot line closer to the home at 2990 Sussex results <br /> in a side setback of 34 feet which remains conforming. <br /> Issues for Consideration <br /> 1. The City Engineer has recommended the existing common lot line utility and <br /> drainage easements be abandoned and new easements be established at the <br /> proposed common lot line. <br /> 2. Are there any issues or concerns with this application? <br /> Staff Recommendation <br /> Staff recommends approval of the lot line rearrangement provided the lot line drainage <br /> and utility easements are handled as the City engineer specifies. As this is a lot line <br /> rearrangement which results in a no additional lots, no park fee or stormwater trunk fee <br /> will be required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.