My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-18-2010 Planning Commission Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2010-2019
>
2010
>
10-18-2010 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2012 4:40:39 PM
Creation date
8/14/2012 4:40:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
View images
View plain text
should be no significant increase in staff workload or cost to add floodplain alteration <br /> to the City's current review items for projects not along the Lake Minnetonka <br /> shoreline. For projects on Lake Minnetonka, however, there might be a significant <br /> increase in staff time since administering floodplain alteration rules becomes more <br /> complicated among the many older homes and lots along the lakeshore. <br /> Typically, the costs for reviewing projects under the floodplain alteration rule would be <br /> recovered by Orono through fees or the submittal of escrow by the project proposer. <br /> Rule D: Wetland Protection <br /> The City of Orono passed its Wetland Ordinance on August 22, 2005. Ordinance <br /> revisions are not anticipated as part of assuming the Rule D permitting authority. <br /> Orono's wetland ordinance provides water quality protection of wetlands from <br /> adjacent land-use utilizing native vegetated buffers, setbacks and water quality <br /> treatment requirements. Prior to the City developing and passing a wetland ordinance, <br /> wetland protection from adjacent land-use was under the Minnehaha Creek <br /> Watershed District jurisdiction. <br /> Though the City of Orono has taken on the responsibility for protecting wetlands from <br /> adjacent land-use, the authority to protect the wetlands themselves resides with the <br /> Minnehaha Creek Watershed District and their administration of the State Wetland <br /> Conservation Act(WCA). To take over authority under Rule D, Orono would be <br /> assuming the new position as the Local Governmental Unit(LGU)for this state law. <br /> The WCA protects wetlands from draining, filling, and in some cases excavation. In <br /> cases where wetland protection is not feasible, wetland mitigation is required. <br /> The responsibilities of the LGU (Orono) for WCA include: <br /> 1. Wetland delineation review and record of decision <br /> 2. Wetland permit, no loss and exemption review and records of decision � <br /> 3. Wetland Replacement Site Monitoring Report Review (submitted by <br /> applicants, these are post construction reports for wetland replacement sites <br /> that show how wetlands are developing). <br /> 4. Providing knowledgeable and trained staff with expertise in water resource <br /> management to manage the program or securing a qualified delegate <br /> (consultant). <br /> The administration of the Wetland Conservation Act would add to the current work <br /> load though some tasks, such as wetland delineation review, would be incorporated <br /> into the buffer review to minimize the additional time. The main addition to staff time <br /> and/or consultant cost would involve the review of permits, exemptions, and no loss <br /> certifications for compliance with the Wetland Conservation Act rules and for <br /> reviewing monitoring reports. These activities are typically billed back to the applicant <br /> either through an escrow set up for longer duration activities or a combined escrow <br /> and fee for shorter duration activities. <br /> MGafi�on RBarth^Orono LGU Discussion 8-10-09.doc Page 2 of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).