My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-19-2010 Planning Commission Packet
Orono
>
Planning Commission
>
2010
>
07-19-2010 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2012 4:26:37 PM
Creation date
8/14/2012 4:26:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� . . . <br /> << •- < <br /> ' CODE COMPLIANCE REVIEW 5 <br /> � CODE COMMENTS <br /> emoval of invasive weeds and invasive or non- <br /> ative plants. <br /> he quality of the runoff flowing into the Compliance will be determined during the <br /> etlands is also regulated. eview of the drainage plan. <br /> Summary of Compliance Review for Comprehensive Plan and City Code provisions outside the <br /> zonin code: , <br /> CODE OMMENTS <br /> Comprehensive Plan � <br /> � ixed Use Designation is pending; current he proposed use would be compatible with <br /> esignation is reflected by the zoning. ither designation. <br /> trail along Shadywood Road is included in t is unlcnown when such a trail would be <br /> e Transportation Plan. onstructed or how easement acquisition and <br /> ' onstruction would be funded. It has not been <br /> etermined which side of the road the tra.il <br /> ould be on, although recent studies show this <br /> side of the road as the preferred side. It is not <br /> own if one trail would accommodate both <br /> edestrians and bicyclists or if a side walk , <br /> ould be built for pedestrians and a bicycle <br /> land added to the roadway. With so many <br /> owns it � <br /> Chapter 14 Sewer and Water � <br /> e City Engineer approves the plans for the e City Engineer has reviewed these plans. <br /> xtension of sewer and water into the site. orrections are required but with those <br /> 's will occur before final approval. orrections the plans should be satisfactory to <br /> e City Engineer. On this site the location of <br /> e sewer and water services has no impact on <br /> e site lan. <br /> Chapter 79 Construction Site Runoff , <br /> Control <br /> Storm Water Pollution Plan (SWPPP) is his plan is approved by the City Engineer. <br /> equired. erosion control permit is issued at the same <br /> ime the building permit is issued. The plan <br /> should have no impact on the site plan. It <br /> � elps ensure that erosion does not impact <br /> � djacent neighboring properties from the <br /> ommencement of the project to its end. One <br /> f the requirements is that ground cover be <br /> stablished the area of the future building <br /> shortly after the area is graded. <br />
The URL can be used to link to this page
Your browser does not support the video tag.