My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-19-2010 Planning Commission Packet
Orono
>
Planning Commission
>
2010
>
07-19-2010 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2012 4:26:37 PM
Creation date
8/14/2012 4:26:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br /> � . , <br /> Project supplemental narrative for <br /> Woodhill Senior Cottages of Navarre 7/1/10 <br /> � 2525,2535, & 2545 Shadywood Rd <br /> Floor plan and site plan modifications � <br /> We received the updated wetland delineation report from Svoboda Ecological <br /> Resources, and the wetland edge for the western wetland area shifted to the east <br /> slightly. In order to maintain the required buffer distance, setback from the buffer <br /> and adequate retaining wall maintenance distance from the buffer,we needed to <br /> reduce the size of the footprint of both the phase 1 and the phase 2 buildings. We <br /> reduced the square footage of each building by 195 SF, and more importantly made <br /> the shape of the building more compact thereby fitting on the site better. We also <br /> adjusted the parking area to accommodate the same 24 parking spaces,but reduced <br /> the overall hard surface coverage by 2,548 SF. . <br /> We are attaching a full copy of the updated wetland delineation report,the revised <br /> . floor plan and site plan,hard surface calculation and building code analysis. <br /> � Building classifications <br /> � There was a question by the Fire Chief regarding the appropriate code classification <br /> for the building. We met with both Chief Eyll and Building official Oman and came <br /> to an agreement that the correct building code classification was R-4 (see attached for <br /> full code analysis). <br /> Storm water runoff calculations <br /> The ponding and filiration basins have been designed to accommodate the original <br /> submission hard surface numbers. Even though the hard surface areas have been <br /> reduced, we decided to leave the ponding design the same as the original. <br /> Revised notification list <br /> We are submitting a new certified mailing notification list that increases the <br /> notification distance from the required 350 ft distance to 600 ft. This is the <br /> notification distance that the Minnehaha Watershed District requires, and we felt it <br /> provided a more effective notification area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.