Laserfiche WebLink
t � " � <br /> � � <br /> #10-3471 <br /> July 19,2010 <br /> , � Page 7 of 8 <br /> 19. Preserves existing unique and natural features of the site and minimizes impacts to <br /> wetlands, floodplains, and shoreland areas; <br /> The City's wetland and storm drainage regulations will ensure wetland and floodplain ` � <br /> impacts are minimal. The application complies with applicable shoreland regulations. <br /> There are no natural features on the site that can be considered unique. <br /> 20. All exterior lighting sha11 be so directed so as not to cast glare toward or onto the public <br /> right-of-way or neighboring residential uses or districts; <br /> The lighting plan satisfies this requirement. To address lighting that may be added to the <br /> site in the future, the�e should be a condition to the conditional use permit to require <br /> dark sky compliant fixtures and maintenance of zero light levels at the property line. <br /> 21. Incorporates efforts to conserve energy whenever practical; <br /> The Project Narrative does not specifically address this. The applicant should be asked <br /> �about it. <br /> , 22.Not detrimental to the public health,public safety, or general welfare. <br /> _ A conditional use permit/site plan approval may be granted subject to such conditions as the <br /> council may prescribe. <br /> Staff Recommendation <br /> Staff recommends approval of the conditional use permit and site plan but denial of the setback <br /> variance if the following are provided before Council consideration of the permit: <br /> 1. Revised plans reflecting the most recent site plan and the City Engineer's comments. <br /> 2. A revised landscape plan changing the row of axborvitae as recommended by staff and <br /> includ.ing a wetland buffer improvement plan. <br /> and the following conditions are attached to the final approval: <br /> 1. Any additional lighting on the site to be dark sky compliant and not create glare, with the <br /> zero light level at the property line being maintained. <br /> 2. The Owner providing an escrow and signing an escrow agreement to ensure that erosion <br /> and sediment control measures are properly mainta.ined. <br /> 3. The Owner providing the financial securities required by code to ensure that all non- <br /> building improvements are properly installed, including sewer and water lines and <br /> services. <br />