Laserfiche WebLink
. � . <br /> ZONIIVG REGITLATIONS § 78-627 <br /> �� � _ <br /> ! � <br /> � . (10) Plan for timing and phasing of the devel- (3) Detailed landscaping, sign and lighting <br /> opment; � � ' plans; and <br /> (11) Covenants or other restrictions proposed (4) Detailed trail plan. . , <br /> for the regulation of the development; (e) Substantial compliance. The final site and <br /> (12) Renderings or elevations of all sides of building plan shall be in substantial compliance <br /> buildings to be constructed in the first with the approved master development plan.Sub- <br /> phase of the development; stantial compliance shall mean: <br /> (13) �ail plan; and (1) Buildings,parking areas,roads and trails <br /> (14) Lighting plan. are in substantially the same location as <br /> previously approved; <br /> Approval of the master development plan shall (2) The number of residential living units has <br /> indicate approval of the listed items in subsec- not increased or decreased from that ap- . <br /> tions(b)(1�(b)(14)of this section and shall occur proved in the master development plan; <br /> in conjunction with rezoning of the property to �3) The oss floor area of an <br /> RPUD. After rezoning the property to RPUD, �' y individual <br /> nothing shall be constructed on the RPUD site building has not been increased from that <br /> except in conformance with the approved plans approved in the master development plan; <br /> and this section. The procedure for notification of (4) There has been no increase in the number <br /> and public hearing on the master development of stories in any building; <br /> plan shall be the same as required for a zoning (5) Open space has not been decreased or <br /> map amendment by this chapter. altered to change its original design or � <br /> - (c) Development dgreement/financial guaran- intended use; and <br /> _ tee. Following the approval of the master devel- (6) All special conditions required on the mas- <br /> � • opment plan but prior to final plan approval, the ter development plan by the city have <br /> applicant shall enter into an agreement with the been incorporated into the final site and <br /> city relating to the terms of the RPUD develop- building plan. <br /> ment, and shall also provide such financial guar- <br /> antees as the city requi.res or deems necessary. Approval of a final site and building plan shall <br /> Such agreement may take the form of: signify approval of all pla.ns necessary prior to <br /> application for a building permit, subject to con- <br /> (1) A development contract; formance with any conditions on the approval and <br /> • (2) A site improvement performance agree- subject to other necessary approvals by the city. <br /> ment; and/or (fj Simultaneous review. Applicants may com- <br /> (3) Another form of binding instrument as bine the final site and building plan review with <br /> , may be required by the city. the master development plan review by submit- <br /> ting all information required for both stages si- <br /> (d) Final site and building plan. Approval of a multaneously. <br /> final site and building plan for the entire RPUD <br /> or for specific parts of the RPUD shall be subject �g� B¢sis for dpproval; conditions. In evaluat- <br /> to the procedures outlined in this division. The ing a site and building plan, the planning com- <br /> final site and building plan shall contain informa- �ssion and city council shall base their recom- <br /> tion as required by the city, including the follow- mendations and actions regarding approval of a <br /> �g; RPUD on a consideration of the following: <br /> (1) Detailed utility,street,grading and drain- �1) Compatibility of the proposed plan with <br /> a e lans• this section and consistency with the goals, <br /> g p ' policies, and objectives of the comprehen- <br /> (2) Detailed building elevations and floor sive plan and surface water management <br /> plans; ` plan; <br /> * CD78:121 <br />