My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-17-2010 Planning Commission Packet
Orono
>
Planning Commission
>
2010
>
05-17-2010 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2012 3:51:03 PM
Creation date
8/14/2012 3:50:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1� 11+ <br /> (1) Building location, height, bulk and square footage; <br /> (2) Type and square footage of specific land uses; <br /> (3) Number of dwelling units; <br /> (4) Detailed street and utility locations and sizes; <br /> (5) Parking layout; <br /> (6) Drainage plan,including location and size of pipes and water storage areas; <br /> � (7) Grading plan and drainage plan,including two-foot contours; <br /> (8) Generalized landscape plan; <br /> (9) Generalized plan for uniform signs and lighting; <br /> (10) Plan for timing and phasing of the development; <br /> (11) Covenants or other restrictions proposed for the regulation of the development; <br /> (12) Renderings or elevations of all sides of buildings to be constructed in the first phase of the development; <br /> (13) Trail plan;and <br /> (14) Lighting plan. <br /> Approval of the master development plan shall indicate approval of the listed items in subsections(b)(1)--(b)(14)of this <br /> section and shall occur in conjunction with rezoning of the property to RPUD.After rezoning the property to RPUD, <br /> nothing shall be constructed on the RPUD site except in conformance with the approved plans and this section.The <br /> procedure for notification of and public hearing on the master development plan shall be the same as required for a � <br /> zoning map amendment by this chapter. <br /> (c) Development agreement/financial guarantee. Following the approval of the master development plan <br /> but prior to final plan approval,the applicant shall enter into an agreement with the city relating to the terms of the RPUD <br /> development,and shall also provide such financial guarantees as the city requires or deems necessary.Such agreement <br /> may take the form of: <br /> (1) A development contract; <br /> (2) A site improvement performance agreement;and/or <br /> (3) Another form of binding instrument as may be required by the city. <br /> (d) Final site and building plan.Approval of a final site and building plan for the entire RPUD or for specific <br /> parts of the RPUD shall be subject to the procedures outlined in this division.The final site and building plan shall contain <br /> information as required by the city,including the following: <br /> (1) Detailed utility,street,grading and drainage plans; <br /> (2) Detailed building elevations and floor plans; <br /> (3) Detailed landscaping,sign and lighting plans;and <br /> (4) Detailed trail plan. � <br /> (e) Substantial compliance.The final site and building plan shall be in substantial compliance with the <br /> approved master development plan.Substantial compliance shall mean: <br /> (1) Buildings,parking areas, roads and trails are in substantially the same location as previously approved; <br /> (2) The number of residential living units has not increased or decreased from that approved in the master <br /> development plan; <br /> (3) The gross floor area of any individual building has not been increased from that approved in the master <br /> development plan; <br /> (4) There has been no increase in the number of stories in any building; <br /> (5) Open space has not been decreased or altered to change its original design or intended use;and <br /> (6) All special conditions required on the master development plan by the city have been incorporated into <br /> the final site and building plan. <br /> Approval of a final site and building plan shall signify approval of all plans necessary prior to application for a building <br /> permit,subject to conformance with any conditions on the approval and subject to other necessary approvals by the city. <br /> (� Simultaneous review.Applicants may combine the final site and building plan review with the master <br /> development plan review by submitting all information required for both stages simultaneously. <br /> (g) Basis for approval;conditions. In evaluating a site and building plan,the planning commission and city <br /> council shall base their recommendations and actions regarding approval of a RPUD on a consideration of the following: <br /> (1) Compatibility of the proposed plan with this section and consistency with the goals, policies,and <br /> objectives of the comprehensive plan and surface water management plan; <br /> (2) Preservation of the site in its natural state to the greatest extent practicable by minimizing tree and soil <br />
The URL can be used to link to this page
Your browser does not support the video tag.