Laserfiche WebLink
Proposed New Landscapin�: <br /> During the ongoing construction that has been started,our landscaping process will begin this <br /> spring. The landscape design has an overall minimalistic approach focused on sustainabiltty and <br /> naturaiization o�the maJority of both lots. A pool has been designed into the tandscape along with <br /> hardscape material selections being natural stone,Sandcast cancrete,and a chlp-sealed asphalt <br /> driveway from the road to the hause. The hardcover area for bath lots is 18.97%with each individual <br /> lot having a hardcover caunt of 19.769b(lot 875)and 10.3796(lot$95). Grading over the majorrty of <br /> both lots will take plaee,mainly focused on the mechanical removel of invasive weeds and creating <br /> berms and swales to contrnl water run-off. This process is designed to dramatically increase r►atural <br /> filtrat(on and pre-treatmerit of water run-off and to rapture and hold water run�ff fram the hardscape <br /> and roof areas. After significantly increasing infiltration and pre-treatment,a rain garden along the <br /> north west area witl be created and en already appraved overflow drain installed allowing water to flow <br /> aut through the bluff. Along the bluff side where the overflow drain will be installed,a naturalized <br /> swaie wlll be p(anted to cantinae to pre-treat water as it is released from the drain. A(f dtsturbed areas <br /> will be hydro-seeded with grass seed and wildflower mix applicable#o the sun exposure the areas <br /> reteive. <br /> At thi�time,only a depression for the rain garden has been dug and no boring has been started <br /> for the draln to the bluff. The draln wlll be Instat}ed after the majority of heavy equlpment is done <br /> working around the site to insure that water capture on site will not be polluted and dfscharged through <br /> the bluff. <br /> The horne and landscape cons#ruction project will run ttirough the Summer of 2p16 and is <br /> estimated to be compfeted in September of ZQ16. <br /> Erosion Control Measures: <br /> Due to the construction or�the 875 lot,alor�with the amount of soii disturbed and moved <br /> tfi�roughout both lots,a sift fence has been wrapped around the entlre lat wfth areas aiong the north and <br /> west s9de(lake side)having erosion fogs also laid down. A temporary construction road has been built <br /> with 2-4"Buff Limestone rock that enters the 875 property from Tonkawa Road. Alt the water run-off <br /> from the construction area,along with the new roof,has been accounted for and captured to stay on <br /> site. Mechanical equipment is parlced around the faundatfon of the new home or on tfie construction <br /> entrance arui driveway that has been created. <br /> Disturbances of 5oil• <br /> The grading associated w�th this pr4ject and proposed iandscape design will be completed over <br /> the mayor'cty o#the existing 895 and 875 lo#. No grading will take place within the 75'setback alang the <br /> bluff. A berm, roughly 4 feet,will be created along the south side of the 895 property and cfesigned to <br /> help hold and captur+e water runoff towards the empty lot boarding the 895 property. This water will be <br /> dlrected to stay and infiftrate on the 895 lot. The grading wlll atso be done to maintain and at some <br /> points create a high point along the 7S'setback so no water wilf be flowing directiy over the bluff. <br /> After the grading has ta�Cen ptace per the proposed grading�lan this spring,hydro-seed will be <br /> spread over the majorrty of the bt ta preverrt any wast�out of soils. The hydro-seed mix will be <br /> specified to the sun requirements throughout the dFffereRt areas an the lat. This mix will ir�ciude prairie <br /> grasses and wi�dflowers for the sunny spots and a fescue and woodland flower mix fo�the shaded areas. <br /> 1�EC�111�� <br /> APR 0 � �01� <br /> .�� . # 382b <br />