Laserfiche WebLink
� , 16-3819 <br /> Aprii 13,2016 <br /> Page 3 of 6 <br /> contains a number of mature trees. The shape of the existing property is somewhat of a point <br /> jutting into North Arm Bay, and as such has shoreline r��nning north south and shoreline running <br /> east-west. The linear shape of the property forces the proposed lots to be long and narrow in <br /> order for each lot to have at least 140' of w�idth. T'here aze a few small azeas of wetland aiong the <br /> northerly shoreline. <br /> Lot Layout and Lot Standards <br /> The property consists of a single tax parcels totaling 3.98 dry buildable acres, proposed to be <br /> subdivided to create 3 single faznily lots. The subdivision layout of the site is dictated primarily <br /> by the long, narrow shape of the parcel and the desire to create 3 confornung 1-acre lots ea.ch <br /> having lake access, and each with a building site that overlooks the lake. <br /> A potential issue with the proposed house site on Lot 1 is that no structures are allowed within <br /> 30' of the top of blufF, and the top of bluff will most likely be defined as the 960' contour, at <br /> least in the westerly portion of the proposed house site. The 30' setback would likely force the <br /> house further west, away from the lake and closer to the cul-de-sac. <br /> For Lot 2, topography and the location (and maintenance needs) of the existing municipal sewer <br /> 1'znes are complicating factors. The municipal sewer installed in 1973 crosses the property from <br /> north to south. See Ezhibits C & D. The sewer lines consist of a gravity line flowing from <br /> south to north across the site, discharging to a lift stazion at the very north end of the property at <br /> the shore, which in turn pumps into a para11e1 forcemain that runs back up the hill adjacent to the <br /> gravity line, dischazging to a manhole in Windjammer Lane. <br /> The easement for that sewer line pai.r is 20' wide, and no structures can be built over that <br /> easement. The impact is that the proposed house location for Lot 2 is restricted to the triangle <br /> between the sewer easement and the 75' setback. To make matters worse, the actual vehicle <br /> route used by the Public Works Department follows dashed iine on Exhibit C for maintenance of <br /> the lift station, due to the topography. It is necessary on a regular basis to bring a truck down to <br /> the lift station for maintenance, and there is no other way to access the lift station. The City <br /> needs to preserve tlus non�asement route for futtu�e sewer system maintenance. The 44'x80' <br /> "possible house" site depicted on Lot 2 is virtually the only area of Lot 2 that is a desira.ble house <br /> location under the proposed subdivision layout; but also consider that it is likely a house at this <br /> will be expected to have decks, patios, and a walkout configuration. City code will disallow any <br /> grading or filling within the 75' zone, and there is barely 5 feet of elevation change from the 75' <br /> line to the sewer easement. All of these factors dictate the need for careful and creative house <br /> design for Lot 2. <br /> Lot 3 contains the existing house, built in 1956 according to tax records. Replacing the house <br /> will likely require it to move back from the lake some distance, as the 75' setback line appears to <br /> run through the east side of the structure. With or without the proposed subdivision, an average <br /> lakeshore setback variance would be required for replacement of this house. <br /> Road Layont and Standards <br /> An initial question for discussion is whether the road serving the proposed 3-lot development <br /> should be public or private. The CMP Transportation Plan in Urban Transportation Policies <br /> states: <br /> 1. Local streets in the urban area will be owned and maintained by the City. Because the <br /> land use and street use derts�ity of the urban neighborhoods is relativety high, the City <br />